Ask Civil Engineering Expert

1) You are given the following information about a dry-batchpaving operation. You are going to use one mixer that has a servicerate of 30 serives/hr. The dry-batch trucks you use forbringing concrete to the paver have an arrival rate of 7.5 arrivals/hr. Each truck carries 6 cu yd of concrete. You have a totalamount of 13,500 cu yd of concrete to pour. You rent a truckat $100/hr, and the paver at $300/hr.If the job takes more than 80hrs, you pay a penalty of $700/hr owing to delays in jobcompletion. On the basis of least cost, determine the numberof trucks you should use. Plot the cost versus the number oftrucks used.

2) As a contractor, you are blasting rock out of a quarry andhauling it down to the waterfront in dump trucks to form a jetty(see picture on following page).

Quarry blasting

Blasted rock has 0.69 swell factor

Loose rock density = 1.4 tons/yd3

Blasting produces 500 yd3 of loose rock every houron average

Efficiency is already factored in to the blasting productionrate

Trucking

You have 5 off-road dump trucks to transport the rock

Capacity = 25 yd3 of loose rock each on average

Efficiency: trucks work 55 minutes out of every hour

Typical haul cycle:

5 minutes loading

8 minutes from quarry to jetty

1 minute dump

8 minutes return trip

Jetty placement

The jetty consists of 100,000 yd3 of rock materialthat you must place

Once placed, “jetty rock” has an average density of1.45 tons/yd3 in place

It takes 3 minutes for the excavator on the jetty to adjust therocks dumped by each truck so that they are properly positioned inthe jetty. The next truck cannot dump its rocks until the excavatoris done with the positioning from the previous truck.

Efficiency: excavator works 50 minutes out of every hour

Answer the following questions:

What is the density of the rock (in tons/yd3) in the bank before it is blasted out?

How many complete cycles can a truck make in 1 hour?

What is the productivity of this operation in terms ofyd3/hr of jetty rock?

How many total truck loads do you need to place all the jettyrock?

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91068240

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As