Ask Civil Engineering Expert

1. You add 100 mg/L of glucose to pure water, then decide that this was a mistake and decide to remove it biochemically before you serve the water to your friends at a cocktail party. To remove the glucose, you seed the water with a harmless bacterial culture. No problem. You purchase the seed culture for a BOD test and then run the test, adding nitrogen and phosphorus for bacterial growth.
Assume that all the glucose is biodegradable. To get things going, you measure the initial rate of O2 utilization in the 100 mg/L glucose solution in a BOD bottle seeded in exactly the same way as a BOD measurement. In 5 hours, 2 mg/L of O2 is gone (initial rate only because you will soon run out of dissolved oxygen).
a. Find the ultimate BOD, k (the first order rate constant for BOD removal) and the 5-day BOD of the water in the bottle. Note, there is no dilution in this test so you will have to rely on the initial rate data provided above.
b. You are exceptionally clever and find a way to recreate the bacterial and culture conditions from the BOD test in a CSTR under steady conditions. That is, Cin = 100 mg/L glucose, cell number, nutrient concentrations and so forth are unchanged. If the flow rate is 1 MGD, how large should the CSTR be to provide an effluent concentration of 1 mg/L glucose? How long would it take in a PFR to achieve the same degree of treatment under the same conditions?
2. A wastewater has a BOD5 of 200 mg/L at 25oC, and under these conditions, k = 0.25 day-1. Find,
a. the ultimate BOD
b. the BOD5 at 20oC.

3. A wastewater treatment plant discharges 0.5 m3/s of effluent with Lo = 80 mg/L into a stream flowing at 10.5 m3/s. Just above the discharge point, L in the stream is 3.0 mg/L. Assume that kd = 0.22 day-1.
a. What is the ultimate BOD of the completely mixed wastewater/water mixture immediately downstream from the outfall?
b. If the cross-sectional area of the stream is 55 m2 (a constant), find the ultimate BOD at a point 10,000 m downstream.
c. At some points, the stream width is reduced by half, but the depth is unchanged. Would this tend to reduce or to increase the ultimate BOD at the 10,000m point? How about the dissolved O2 level at that point? Explain.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9876696

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As