1. Draw a plan of a typical strip mine showing all operational features and equipment.

2. Answer the following:

a. Why is the working slope of an open pit usually much flatter than the final slope?

b. Provide a sketch to show the difference between the final and the working slopes.

c. Why do operators try to steepen the final slope to an allowable safe maximum angle?

3. Define the following

1. swell factor :-

a. Swell factor

b. Struck Capacity c. HeapedCapacity d. Fill Factor

e. Rolling resistance

f. Bank cubic metre

g. Loose Cubic metre

4. Compare the performance of a hydraulic excavator and an electric shovel.

5. Discuss the factors that favour the use of scrapers over the use of trucks and loaders.

6. Discuss the following:

a. List all the major mining operations that are associated with surface mining.

b. List all the auxiliary operations that are associated with surface mining.

c. Define production scheduling

d. How does production scheduling affect the process of mine planning and design?

e. Name and discuss the overall constraints for production scheduling

7. Answer the following

 a. Define materials handling in surface mining

 b. Name the different types of operations in materials handling

 c. Name the different types of machine used in these operations

 d. Name and discuss the major factors that determine the selection of excavation equipment.

 e. Define the idealised output of a power shovel

8. For the following data for a shovel-truck operation calculate the idealised output in m3/hr.

i. Required production per bench = 5,000 tonnes/shift

ii. Operating period = 2 shift/day (10 hours per shift)

iii. Material = well blasted rock

iv. Working time = 55 mins/hr or 7.5 hrs/shift v. Operating factor = 80%

vi. Specific weight of rock = 2.0 tonne/m3

Calculate the actual shovel production in tonnes/hr given the following: i. Material weight (bank) = 2 tonnes/m3

ii. Swell factor = 30%

iii. Bucket size = 11.5m3 iv. Fill factor = 0.85

v. Cycle time = 30sec vi. Availability = 83 %

9. Answer the following:

a. Discuss the factors that are considered in the selection of a truck as a haulage unit.

b. In determining the cycle time of a haulage unit name the factors in relation to the haulage road that need to be considered

c. Define the following

i. Grade resistance

ii. Rollin resistance

iii. Total resistance

d. Define traction

10. A 90 tonne rear dump truck travels on an 8% grade loose gravel road. Determine the traction and total resistance

i. On the way up when the truck is loaded

ii. On the way up if the truck is empty

For the following conditions:

?Rolling resistance factor = 100 kg/tonne

??Coefficient of friction = 0.35

?Vehicle weight empty = 700 kg/tonne of rated capacity

?Gross vehicle weight = dead weight + capacity

?Grade resistance factor = 10 kg/tonne

?Load distribution = 33 % on front tyres and 67% on rear tyres.

Download:- SURFACE MINING.rar

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9749814
  • Price:- $70

Priced at Now at $70, Verified Solution

Have any Question?


Related Questions in Civil Engineering

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As