1. Describe the advantages of an integrated design approach for the delivery of high performance buildings, including how they can potentially reduce the initial costs of a "green" project.

2. A potential client wants to build an office building in the northern part of the United States (e.g., Southfield, Michigan), where cold winters and hot summers are common every year. The total site area can accommodate any shape and orientation of the building. The client is very interested in having the building certified by LEED, and the client is asking your advice on the matter of green building economics. The client is concern that the design and construction of the building will create additional costs that are not likely found in conventional buildings.

a. Briefly explain to the client what type of "extra" costs they will likely incur and why [note: limit the answer of this question to cost only. See next question to differentiate both answers]

b. (continues from previous question) what is the business case you would present to the owner to offset these costs? That is, what benefits the client will likely have by seeking LEED Certification? Would you propose any alternatives to the ultimate goal of the project?

Assume that you work for "Greenest-of-all," (GOA) a general contractor that is seeking to be involved in the construction of an office building. The owner is looking for a third party certification for the building (e.g., LEED) and you are brought to the project during the design phase. The owner hires "We-Check-It, LLC" (WCI) at the beginning of the design phase to be in charge of the commissioning process, which consist of all mechanical HVAC systems (do not consider commissioning of water systems or building envelope).

a. Describe how the inclusion of the Commissioning Authority (CxA) will likely affect GOA's scope of work and schedule in the project

b. How the commissioning process will affect the scope of work of the subcontractors? Would that affect the quote (price) of the subcontractors and the cost of GOA personnel?

c. Briefly describe the credits the commissioning process will likely affect in the certification of the building.

Electrical & Electronics, Engineering

  • Category:- Electrical & Electronics
  • Reference No.:- M91534987
  • Price:- $45

Priced at Now at $45, Verified Solution

Have any Question?


Related Questions in Electrical & Electronics

1 a name the three major groups of contamination and

1. (a) Name the three major groups of contamination and briefly describe their physical characteristics. (b) Where do the above contamination types come from? Give one example of each. 2. Name two processes metrics which ...

Question 1 a pnp transistor withnbspbeta 60 is connected

Question 1. A pnp transistor with β = 60 is connected in a common-base configuration as shown in figure P5.8 (a) The emitter is driven by a constant-current source with I E = 0.75 mA. Determine I B , I C , α, and V C . ( ...

Research report1 read 3 to 4 journal articles about

Research report 1. Read 3 to 4 journal articles about digital control or industrial control, eg. one particular application, implementation aspect such as selection of sampling time, hardware etc. No text book example is ...

Problem 1given a sequence xn for 0lenle3 where x0 1 x1 1

Problem # 1: Given a sequence x(n) for 0≤n≤3, where x(0) = 1, x(1) = 1, x(2) = -1, and x(3) = 0, compute its DFT X(k). (Use DFT formula, don't use MATLAB function) Problem # 2: Use inverse DFT and apply it on the Fourier ...

Questions -problem 1 - given the sinuosidal voltage vt 50

Questions - Problem 1 - Given the sinuosidal voltage v(t) = 50 cos(30t+10 o ) V, find: (a) the amplitude V m (b) the period T, (c) the frequency f and (d) v(t) at t = 10 ms. Problem 2 - A current source in a linear circu ...

Question -i a star-connected three-phase synchronous

Question - (i) A star-connected, three-phase synchronous induction motor takes a current of 10 amps from a 415 volt supply at unity power factor when supplying a steady load. If the synchronous reactance is 5 ohms/phase ...

Question 1 - for the transistor in the circuit shown in

Question 1 - For the transistor in the circuit shown in Figure, assume β = 120. Design the circuit such that I CQ = 0.15 mA and R TH = 200kΩ. What is the value of V CEQ ? Question 2 - (a) For the circuit shown in figure, ...

Assignment -consider a common emitter amplifiernow lets say

Assignment - Consider a common emitter amplifier: Now let's say that R B and R C do a fine job at DC biasing the BJT but they are large so they can be neglected for small signal (AC) analysis. In that case, the equivalen ...

Summative assessmentin 2017 sej101 assessment will consist

Summative Assessment In 2017 SEJ101 assessment will consist of nine tasks that will develop a portfolio of your assessed work. Throughout the trimester you will have the opportunity for feedback on all nine tasks before ...

Problems -problem 1 - find v0 in the op amp circuit of fig

Problems - Problem 1 - Find v 0 in the op amp circuit of Fig. 1. Problem 2 - Compute i 0 (t) in the op amp circuit in Fig. 2 if v s = 4 cos(10 4 t). Problem 3 - If the input impedance is defined as Z in = v s /I s , find ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As