1. Aim

The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and elevations of the proposed project which are numbered A-01 to A-04 inclusively. Please note that this development should be treated as fictitious and it is described purely for the purpose of the 300707 Building 2 major assignment in 2018. Do not contact Albury City Council as there are no records or documentation of this project available through the council. You will find the necessary resources to complete the proposed project in the assignment resources folder on vUWS.

2. Type of Development
An irregular parcel of land in Albury, NSW is to be developed for retail showrooms and warehousing. This type of development is commonly used for bulky-goods sales. You are to act as an advisor to the Client for which you will be paid a fee. Your aim is to help this client optimise the potential for a successful development. In this regard you are looking at the key aspects of Time, Cost, Quality, Safety and the Risks involved in planning and constructing the project. You will not be involved in the leasing and/or on-sale of the project which, of course, ultimately determines overall profitability. This will be dealt with at a later stage in your course.

You can assume all existing buildings have been demolished and the land grubbed and levelled awaiting excavation for your development. Surrounding streets and businesses need to operate unimpeded throughout the construction of this building. Protection and construction logistics will need to be considered in this regard. Assume that your main access for deliveries will be via the two street frontages and the terrace frontage. Construction zone(s) may or may not be necessary depending on how you plan to take delivery of materials. Be aware that permission is granted by Local Council and there is a cost implication depending on extent and lengt h of time in operation. However, you do not need to allow for Council approval time as the Construction Certificate (CC) has been issued and the tender has been awarded.

We do not know who will be occupying the building as it is a speculative development. Consequently, interior fit-out, ceilings, floor finishes, services etc., will be basic in nature and confined to the office areas only. Externally, we need to present a good standard. Car parking and landscaping are necessary. Assume that corporate image (signage, colours etc.) will be added when tenants are known which, we envisage, will be well after your involvement in this project has finished. The image below demostrates the extent of the construction works and the footprint of the proposed project.

3. Objectives
Students are required to work in groups of a maximum of 6 (ideally 4-6) people or less on the abovementioned project under the direction of a group member who will play the role of the group leader/manager. Regardless of group sizes, all portions of the assignment must be submitted in the final report. We are expecting a professionally researched and presented written report and verbal presentation which would be suitable for submission to a "real-life" client. Some sections or parts of the assignment are unclear and you will need to make some assumptions especially where the drawings are unclear of the actual requirements. The assignment consists of three components which are listed and explained in detail below:
1. Part A - Progress report
2. Part B - Professional report
3. Part C - Visual and oral presentation

Progress Report
The progress report is approximately 1000 words excluding references. Students are required to analyse the proposed construction and provide recommendations with the following information in a brief progress report:
- List of group members names, roles, responsibilities and task allocation (stating clearly the group leader/manager)
- Suitable budget or costing (Rawlinsons construction cost guide)
- Preliminary timeline/schedule of project (MS Project/ MS Excel or MS Word Table)
- Recommended project delivery method (project procurement - Australian Standards Contracts)
- Draft specifications (Building A, B and 1 fit out trade)
- Proposed block model construction (materials and methods)

Primary Tasks:
- Civil works (your group will determine what needs to be undertaken to the existing contours)
- Foundations and footing systems, including detail as to why the system was chosen
- Wall systems
- Roofing systems
- Suspended floor systems and stairs
- Fit-out

Secondary Tasks:
- Budget
- Time schedule
- Project delivery/Contract
- Specifications
- Block Model
Please refer to the Professional Report Template on vUWS for detailed instructions on the layout and formatting of the final report.

4. Visual and oral Presentation

Students will present Part B of the assignment as a 5-minute PowerPoint (PPT) presentation with a 5-minute question and answer session with your tutor and your peers. Therefore, you will be allowed a maximum of 10 minutes which includes changeover time and time for setting up your screen etc. You will need to bring the final PPT presentation on a USB Drive and leave a copy of your presentation on the desktop of the computer provided to you. Please ensure that your presentation is formatted for a PC/ Windows based operating system to avoid delays. A few tips to make your presentation more effective:
- Practice at least once with your group members a day or two prior to your presentation
- Slides should be professionally presented and checked for spelling or grammatical errors
- All slides should be consistent with headings, neutral backgrounds and text clearly visible
- Include sources of images and references where appropriate
- Lessons learned throughout the semester
- Make it fun and include as many pictures of your proposal including the block model as possible

5. Group Registration

Students are required to register their groups on vUWS under the "Groups" folder found on left hand side of the home page of vUWS. Please do not join a group without first consulting with the other members of the group. This is not fair to the existing group members and you will be removed from that group if you did not obtain permission or consult with members beforehand. In addition, all mem bers of the group are expected to contribute towards group activities through regular communication. There are a number of tools available through the online groups page for communication such as email, general discussion within group and file sharing etc. Furthermore, groups are encouraged to meet at once weekly, communicate regularly and the group leader/manager member should keep a record of these meetings to ensure their success in this unit.

Attachment:- Assignment.rar

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M93137788
  • Price:- $150

Guranteed 48 Hours Delivery, In Price:- $150

Have any Question?


Related Questions in Civil Engineering

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As