1. When the height is measured with reference to a give level surface such as mean sea level, it is called a _________________.

a. measurement
b. plumb line
c. leveling loop
d. elevation

2. An acre is equivalent to _________ square chains, and _______________ sq. ft.

3. Add 45°30'47" to 22°37'30"

4. A parcel of land has the shape of a trapezoid, with the base equal to 3000 feet, the other base equal to 2500 feet and the altitude h equal to 400 feet. The value of the land is $40,000 per acre. How much is the parcel of land worth?

5. The vertical angle from level ground to the top of a building is 50°. The angle is measured from a point that is 150 feet from the base of the building. How tall is the building?

6. A point has polar coordinates (111.80, 26.56°). Determine its corresponding rectangular coordinates.

7. A point along a road centerline is located 1320.39 feet from the point of beginning. If the point of beginnings station is 10+00. What is it's station designation?

8. Complete the benchmark-leveling field notes shown in the following table by computing and recording the HI and elevation for each TP and benchmark and show leveling error.

483_How much is the parcel of land worth.png

9. Trigonometric leveling-If the Rod height was 5.4 feet at the BS (elevation 4700.00), the zenith angle was 62°50'30", the slope distance was 450.00 feet. What is the height of the instrument? Then you turn to a FS and read a zenith angle of 90°12'59" and the slope distance is 380.00 feet, the Rod height was 6.3 feet at the FS, what is the elevation of the point at the FS?

10. Express the following zenith distances (angles) as vertical angles:

a. 80°35'15"
b. 87°14'56"
c. 104°30'40"

11. The magnetic bearing of a boundary line was recorded as S 43°30'E in 1862. At that time and place, the magnetic declination was known to be 3°15'W. Determine the true azimuth and bearing for that line.

12. The U.S Public Land Survey System was developed to:

Avoid errors and confusion that existed in the colonial states

Manage, lease, or sell land in the public domain

Provide a uniform and consistent system for dividing the lands

All of the above

13. Describe parcels E & H using aliquot parts description and calculate the area of each in acres.

169_How much is the parcel of land worth1.png

14. Label parts of the following diagram with PC, PT, PI, LC, M, E, R, Δ, L, T

2466_How much is the parcel of land worth2.png

15. For the simple curve with an arc length of 1090.83 feet and a tangent of 606.81 feet, if the station of the PI is 24+57.00, what are the stations of the PC and the PT?

16. For a preliminary vertical alignment of a roadway, the straight tangent sections are established as follows:

Station 10+00.00, tangent elevation = 2889.07
Station 12+69.55, tangent elevation = 2897.82
Station 16+63.64, tangent elevation = 2923.00
Station 20+97.80, tangent elevation = 2906.25
Station 23+30.05, tangent elevation = 2922.29

Determine the gradient of each tangent.

17. BONUS:  Given a vertical parabolic curve that has its PVI at station 16+63.64 and elevation at 2923.00. The grade of the back tangent is +6.39%, the grade of the forward tangent is -3.86%, and the curve length is 300 ft. What is the Station and Elevation of the turning point (high point)? What is the Elevation of Station 16+00?

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91087270

Have any Question?


Related Questions in Civil Engineering

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As