Ask MATLAB Expert

Matlab Project -

In this project, we want you to gain practice in data manipulation by using existing UROS data and accepted industry standard tools (MATLAB and Excel) to show several descriptive analysis. You will be writing a MATLAB script that will analyze total costs, scores, and cost effectiveness of UROS groups from Fall 2016 and Fall 2017 and comparing them to your own competition results.

READ ALL DIRECTIONS. 

1. Import data on Scores and Costs of groups from Fall 2016 and Fall 2017 semester groups from the following files (use "Data Manipulation" tutorial PPT if necessary):

a. You may use xlsread() or csvread().

b. ENES101_Project_Fall16_Costs.csv 

c. ENES101_Project_Fall16_Scores.csv

i. This shows scores for two rounds. Only use the maximum score for each group in the following prompts.

d. ENES101_Project_Fall17_ScoresCosts.csv

e. Note: It is important that you do not edit the CSV files at all. ?

We will run your code using the original files and if you alter them your project will not run correctly when it is being graded.

f. See Matlab reference link at bottom of page for csvread() documentation

2. Compute cost effectiveness for each group in Fall 2017. CE = SCORE / COST. Display as an array/vector

3. Find the maximum, minimum, mean, mode, variance, and standard deviation of scores and costs for (1) Fall 2016, (2) Fall 2017, and (3) the combination of both semesters.

a. Clearly indicate and display your calculated values.

b. You may use Matlab's built-in functions. 

4. Find the mean score? and total cost? (may use built in function) of each discussion of Fall 2017. (Store in two vectors for use in part 7a). It is not needed to display this as it will be used in part 7a.

5. Determine a meaningful threshold for the score outliers and count them for (1) Fall 2016, (2) Spring 2017, and (3) the combination of both semesters. Your output must include the threshold and the outlier count.

a. Write a comment for how you determined the meaningful threshold (doesn't need to be done in Matlab code, just include it). 

6. Initialize variables for your team's final cost, best score, and EXPECTED cost effectiveness (you should have calculated this early in the design phase). Use these values to calculate the following:

i. Experimental error for cost effectiveness

ii. Use these values to place your own scores on the graphs described in #7

iii. Initialize these variables at the top of your script.

my_best_score = 3500;

my_expected_CE = 21.4; (and so on...)

7. You will be graphing the data after it is all gathered and calculated. Each graph should have a title, x and y-axis labels with units, and a legend if necessary.

a. Graph (scatter) the mean scores and costs of each Fall 2017 discussion found in #4.

Cost should be the dependent variable, score should be the independent variable.

On the same graph, mark the total mean with a "star" point (found in #3), and your own score with a "square" point. 

b. Create a histogram of cost effectiveness values of the combined semesters. Use bin size = 9. 

c. Plot the Least Squares Regression Line Cost Effective Value vs Score with score as the independent variable and cost effectiveness as the dependent variable. Use the data for the combined semesters. Mark your CE and Score with a "star" point. (Can use hold - see references)

Attachment:- Assignment Files.rar

MATLAB, Engineering

  • Category:- MATLAB
  • Reference No.:- M92811278

Have any Question?


Related Questions in MATLAB

Assignment - matlab programmingusing appropriate matlab

Assignment - MatLab Programming Using appropriate MatLab syntax, write the code required to analyse and display the data as per the problem description. The order of the MatLab Program should be as follows: Variables and ...

Assignment details -need to write a code for connecting

Assignment Details - Need to write a code for connecting segments (Lines) a special case of TSP. The problem is to connect lines in 2d/ 3d space with path obstructions. Can you help me write the code for this? Hope you m ...

Assignment -we have daily gridded rainfall data of 40 years

Assignment - We have daily gridded rainfall data of 40 years and structure of the dataset is like below; Lat = [6.5:0.25:38.5]; Lon = [66.5:0.25:100]; Rainfall (135x129x365x40) (Lon, Lat, days, years). Now, we looking fo ...

Question a safe prime is a prime number that can be written

Question : A safe prime is a prime number that can be written in the form 2p + 1 where p is also a prime number. Write a MATLAB script file that finds and displays all safe primes between 1 and 1000.

Question - verify the attached paper with matlab and get

Question - Verify the attached paper with matlab and get all the results in the paper and explain step by step the matlab code. Paper - Improving Massive MIMO Belief Propagation Detector with Deep Neural Network. Attachm ...

Assignment -data is given on which want to do computational

Assignment - Data is given on which want to do computational production planning using Metaheuristic MATLAB Programming: 1) Ant Colony Algorithm on both Partial and Total Flexible Problem. 2) Bee Algorithm on both Partia ...

What comparison of means test was used to answer the

What comparison of means test was used to answer the question

Question 1 manipulate spectral imagehyperspectral images

Question 1. Manipulate spectral image Hyperspectral images can be seen as a generalisation of normal colour images such as RGB images. In a normal RGB colour image, there are 3 channels, i.e. channels for red colour, gre ...

Assignment -matlab codes and simulated model in

Assignment - Matlab codes and simulated model in simulink/matlab and truetime. 1. Matlab codes and simulink model for pid controller optimization using particle swarm optimization (PSO) my plant is integer order 1000/(s^ ...

Assignment matlab programmingusing appropriate matlab

Assignment: MatLab Programming Using appropriate MatLab syntax, write the code required to analyse and display the data as per the problem description. The order of the MatLab Program should be as follows: Variables and ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As