Mathematics-Supply Greater Than Demand- Transportation Model
A company which owns hauling trucks moves materials between three sources (depots) and three destination projects. Project 1 needs 280 truckloads each week, Project 2 requires 400, and Project 3 needs 160. Depot 1 can supply 240 truckloads; Depot 2, 320, and Depot 3, 280 each week. Cost information is given below:
To From Project 1 Project 2 Project 3
Depot 1 1000 800 1800
Depot 2 800 600 1000
Depot 3 1400 800 400