If it costs Acme Manufacturing C dollars per hour to operate its golf ball division, and an analyst has determined that C is related to the number of golf balls produced per hour, x, by the equation C = 0.009x squared - 1.8x + 100. What number of balls per hour should Acme produce to minimize the cost per hour of manufacturing these golf balls?