Draw a motion diagram for the train. Assume that the train is moving toward the right and starts to slow down at t = 0. The separation of each dot represents an elapsed time of one second. Include velocity vectors and the acceleration vector in your drawing. Keep in mind that the acceleration of the train has a magnitude of 5 {\rm m/s^2}.