Details:

As a project management professional, it is important for you to be able to review numbers and report on what they are saying. It is also important for you to be able to use software that helps you keep timelines and keep the project running on time and smoothly. This assignment will continue to help prepare you for your responsibilities.

Respond to the Following Problems

You are a project manager on a project that uses earned value management. The project has the following budget and status:

Project Duration (months):

14

Current Reporting Period (month):

6

BAC:

$387,000

Cumulative PV:

$68,345

Cumulative AC:

$78,379

% of the project completed through the reporting period:

19%

Estimate to Complete:

$294,677

Based on this information, determine the following:

  1. Cumulative EV
  2. Schedule Variance (SV)
  3. Schedule Performance Index (SPI)
  4. Cost Variance (CV)
  5. Cost Performance Index (CPI)
  6. EAC (bottom-up)
  7. VAC (bottom-up)
  8. TCPI

Based on your calculations in Question 1 above, respond to the following:

  1. What is the status of project accomplishment performance through the current reporting period? Why?
  2. What is the status of project cost performance through the current reporting period? Why?
  3. Is the project projected to complete over or under-budget? Why?
  4. Interpret the TCPI metric.

Based on your calculations in Question 1 above, an inexperienced and arrogant project analyst from the project management office has computed an additional metric: Cost Schedule Index, which equals SPI * CPI. He wants you to report this metric to the customer, instead of SPI and CPI separately. What should you do and why?

The program manager doubts your numbers. In particular, he does not believe your EAC number and requests that you calculate two independent EACs. In particular, he wants the following IEACs calculated from rows two and four in Table 23-5 in Snyder, (2013).

  1. Compute IEAC1= ((BAC- EV)/CPI) + AC
  2. Compute IEAC2= ((BAC- EV)/(SPI*CPI)) + AC
  3. Interpret IEAC1
  4. Interpret IEAC2
  5. Based on items 1-4 above, what do you think the program manager will request from you regarding the bottom-up EAC?

You are having a hallway conversation with the same project analyst from Question 3, who is realizing that he may not know as much about earned value management as he thought when he joined the company. Still, he is convinced that the following statements below are correct. How would you respond to him based on each statement (i.e., formulate a specific response and supporting rationale for each statement below)?

  1. EAC becomes Cumulative AC at project completion.
  2. Cumulative EV can be greater than BAC at project completion.
  3. EAC can be smaller than BAC at project completion.
  4. ETC can be greater than 0 at project completion.

Ensure that your last name is in the file name and submit your completed Excel file by the end of this week.

You are not required to submit this assignment to Turnitin.

Please complete this work correctly and as soon as possible.

Physics, Academics

  • Category:- Physics
  • Reference No.:- M92310767
  • Price:- $20

Priced at Now at $20, Verified Solution

Have any Question?


Related Questions in Physics

Question a plastic rod is charged to -20 nc by rubbinghave

Question: A plastic rod is charged to -20 nC by rubbing. Have electrons been added to the rod or protons removed? Explain. How many electrons have been added or protons removed? The response must be typed, single spaced, ...

Question a solenoidal coil with 25 turns of wire is wound

Question: A solenoidal coil with 25 turns of wire is wound tightly aroundanother coil with 300 turns. The inner solenoid is 25.0 cm long andhas a diameter of 2.00 cm. At a certain time, the current in theinner solenoid i ...

Initially at time t 0 a particle is moving vertically at 5

Initially (at time t = 0) a particle is moving vertically at 5 m/s and horizontally at 0 m/s. Its horizontal acceleration is 1.6 m/s2. At what time will the particle be traveling at 57? with respect to the horizontal? Th ...

You throw two balls of equal masses m0992 kg vertically

You throw two balls of equal masses ( m =0.992 kg) vertically upward at an interval of Δ t =  1.41 seconds with the same initial speed of  v i=35.3 m/s from the same height. At what height will they collide, measured rel ...

Question a steel cable with mass is lifting a girder the

Question: A steel cable with mass is lifting a girder. The girder is speeding up. Part A Draw a free-body diagram for the steel cable. Draw the vectors starting at the black dots. The location and orientation of the vect ...

Question an organ pipe is made to play a low note at 275 hz

Question: An organ pipe is made to play a low note at 27.5 Hz, the same as the lowest note on a piano. A) Assuming a sound speed of 343 m/s, what length open-open pipe is needed? B) What length open-closed pipe would suf ...

Question six artificial satellites complete one circular

Question: Six artificial satellites complete one circular orbit around a space station in the same amount of time. Each satellite has mass m and radius of orbit L. The satellites fire rockets that provide the force neede ...

Runner a is initially 59 km west of a flagpole and is

Runner A is initially 5.9 km west of a flagpole and is running with a constant velocity of 8.3 km/h due east. Runner B is initially 4.8 km east of the flagpole and is running with a constant velocity of 7.6 km/h due west ...

Question the tires of a car make 60 revolutions as the car

Question: The tires of a car make 60 revolutions as the car reduces its speed uniformly from 87.0km/h to 64.0km/h . The tires have a diameter of 0.90m. Part A: What was the angular acceleration of the tires? Part B: If t ...

Question a a sled is being pulled along a horizontal

Question: A) A sled is being pulled along a horizontal surface by a horizontal force F_vec of magnitude 600 N. Starting from rest, the sled speeds up with acceleration 0.08 {\rm m/s}^2 for 1 minute. B) Find the average p ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As