Ask MATLAB Expert

Answers should be submitted in an MS Word document. Simulations should accompany answers in a separate MATLAB file.

1)  Queuing Simulator: Consider a communications router that can route (service) EXACTLY 800 messages per second (mps).

  • Assume that messages arrive at an AVERAGE rate of 850 messages per second.
  • Assume that the arriving messages follow an exponential distribution, while the routing (service) times are constant.

a.  Develop and submit a MATLAB Monte Carlo Queuing Simulator that will:

  • Graphically show the number of messages in the queue as a function of time. Provide a screen shot in this word document.
  • In text show the average number of messages in the queue and the average time a message spends waiting in the queue. Provide a screen shot in this word document.
  • Note: you will have to modify the MC Queuing simulator attached

b.  Run your simulation for the arrival and routing (service) rates indicated above for a total of 4000 messages. Provide a screen shot of the results.

c.  Does the queue appear stable from the output? Explain.

d. Does this make sense? Explain. (Hint: look at arrival rates and servicing rates)

2) Queuing Model Questions: Consider a car repair shop a with the following characteristics:

  • 6 customers arrive per hour
  • 4 mechanics
  • Each mechanic is capable of servicing 2 customers per hour
  • Assume that arrival times and service times are exponentially distributed.

a.  How would you represent the system using Kendall's notation?

b.  Calculate:

a.  The utilization factor for the system.

b.  Is the queue stable or unstable? Why or why not?

c.  The average number of customers in the queue.

d. The average number of customers in the system.

e. The average wait time in the queue.

f.  The average wait time in the system.

c.  What is the probability the 3 or fewer more customers will show up in the first hour?

3)  RAM Questions: Consider two years of driving your car.

  • You drive an average of 1 hour a day for 300 days a year.
  • Over this period of time you have experienced 3 malfunctions that have necessitated taking the car in for servicing.
  • When you take the car in for servicing, you spent an average of 3 hours waiting for the car to be repaired.

a.  What is the mean time between failures for your car?

b.  What is the reliability of your car over a 1 year period?

c.  What is the mean down time for your car?

d.  What is the availability of your car?

MATLAB, Engineering

  • Category:- MATLAB
  • Reference No.:- M9532082

Have any Question?


Related Questions in MATLAB

Assignment - matlab programmingusing appropriate matlab

Assignment - MatLab Programming Using appropriate MatLab syntax, write the code required to analyse and display the data as per the problem description. The order of the MatLab Program should be as follows: Variables and ...

Assignment details -need to write a code for connecting

Assignment Details - Need to write a code for connecting segments (Lines) a special case of TSP. The problem is to connect lines in 2d/ 3d space with path obstructions. Can you help me write the code for this? Hope you m ...

Assignment -we have daily gridded rainfall data of 40 years

Assignment - We have daily gridded rainfall data of 40 years and structure of the dataset is like below; Lat = [6.5:0.25:38.5]; Lon = [66.5:0.25:100]; Rainfall (135x129x365x40) (Lon, Lat, days, years). Now, we looking fo ...

Question a safe prime is a prime number that can be written

Question : A safe prime is a prime number that can be written in the form 2p + 1 where p is also a prime number. Write a MATLAB script file that finds and displays all safe primes between 1 and 1000.

Question - verify the attached paper with matlab and get

Question - Verify the attached paper with matlab and get all the results in the paper and explain step by step the matlab code. Paper - Improving Massive MIMO Belief Propagation Detector with Deep Neural Network. Attachm ...

Assignment -data is given on which want to do computational

Assignment - Data is given on which want to do computational production planning using Metaheuristic MATLAB Programming: 1) Ant Colony Algorithm on both Partial and Total Flexible Problem. 2) Bee Algorithm on both Partia ...

What comparison of means test was used to answer the

What comparison of means test was used to answer the question

Question 1 manipulate spectral imagehyperspectral images

Question 1. Manipulate spectral image Hyperspectral images can be seen as a generalisation of normal colour images such as RGB images. In a normal RGB colour image, there are 3 channels, i.e. channels for red colour, gre ...

Assignment -matlab codes and simulated model in

Assignment - Matlab codes and simulated model in simulink/matlab and truetime. 1. Matlab codes and simulink model for pid controller optimization using particle swarm optimization (PSO) my plant is integer order 1000/(s^ ...

Assignment matlab programmingusing appropriate matlab

Assignment: MatLab Programming Using appropriate MatLab syntax, write the code required to analyse and display the data as per the problem description. The order of the MatLab Program should be as follows: Variables and ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As