You are interested in proposing a new venture to the management of your company. Pertinent financial information is given below.

BALANCE SHEET

Cash 2,000,000 Accounts Payable and Accruals 18,000,000
Accounts Receivable 28,000,000 Notes Payable 40,000,000
Inventories 42,000,000 Long-Term Debt 60,000,000
Preferred Stock 10,000,000
Net Fixed Assets 133,000,000 Common Equity 77,000,000

Total Assets 205,000,000 Total Claims 205,000,000

• Last year’s sales were $225,000,000.

• The company has 60,000 bonds with a 30-year life outstanding, with 15 years until maturity. The bonds carry a 10 percent semi-annual coupon, and are currently selling for $874.78.

• You also have 100,000 shares of $100 par, 9% dividend perpetual preferred stock outstanding. The current market price is $90.00. Any new issues of preferred stock would incur a $3.00 per share flotation cost.

• The company has 10 million shares of common stock outstanding with a currently price of $14.00 per share. The stock exhibits a constant growth rate of 10 percent. The last dividend (D0) was $.80. New stock could be sold with flotation costs, including market pressure, of 15 percent.

• The risk-free rate is currently 6 percent, and the rate of return on the stock market as a whole is 14 percent. Your stock’s beta is 1.22.

• Stockholders require a risk premium of 5 percent above the return on the firms bonds.

• The firm expects to have additional retained earnings of $10 million in the coming year, and expects depreciation expenses of $35 million.

• Your firm does not use notes payable for long-term financing.

• The firm considers its current market value capital structure to be optimal, and wishes to maintain that structure. (Hint: Examine the market value of the firm’s capital structure, rather than its book value.)

• The firm is currently using its assets at capacity.

• The firm’s management requires a 2 percent adjustment to the cost of capital for risky projects.

• Your firm’s federal + state marginal tax rate is 40%.

• The firm has the following investment opportunities currently available in addition to the venture that you are proposing:

Project Cost IRR
A 10,000,000 20%
B 20,000,000 18%
C 15,000,000 14%
D 30,000,000 12%
E 25,000,000 10%

Your venture would consist of a new product introduction (You should label your venture as Project I, for “introduction”). You estimate that your product will have a six-year life span, and the equipment used to manufacture the project falls into the MACRS 5-year class. Your venture would require a capital investment of $15,000,000 in equipment, plus $2,000,000 in installation costs. The venture would also result in an increase in accounts receivable and inventories of $4,000,000. At the end of the six-year life span of the venture, you estimate that the equipment could be sold at a $4,000,000 salvage value.

Your venture, which management considers fairly risky, would increase fixed costs by a constant $1,000,000 per year, while the variable costs of the venture would equal 30 percent of revenues. You are projecting that revenues generated by the project would equal $5,000,000 in year 1, $10,000,000 in year 2, $14,000,000 in year 3, $16,000,000 in year 4, $12,000,000 in year 5, and $8,000,000 in year 6.

The following list of steps provides a structure that you should use in analyzing your new venture.

Note: Carry all final calculations to two decimal places.

1. Find the costs of the individual capital components (16 points):
a. long-term debt
b. preferred stock
c. retained earnings (avg. of CAPM, DCF, & bond yield + risk premium approaches)
d. new common stock
2. Compute the value of the long-term elements of the capital structure, and determine the target percentages for the optimal capital structure. (Carry weights to four decimal places. For example: 0.2973 or 29.73%) (5 points)
3. Compute the retained earnings break point. (5 points)
4. Draw the MCC schedule, including depreciation-generated funds in the schedule. (10 points)
5. Compute the Year 0 investment for Project I. (5 points)
6. Compute the annual operating cash flows for years 1-6 of the project. (12 points)
7. Compute the additional non-operating cash flow at the end of year 6. (6 points)
8. Draw a timeline that summarizes all of the cash flows for your venture. (5 points)
9. Compute the IRR and payback period for Project I. (8 points)
10. Draw the IOS schedule, including Project I along with Projects A-E. (5 points)
11. Determine your firm’s cost of capital. (5 points)
12. Indicate which projects should be accepted based on your MCC and IOS schedules, and why. (5 points)
13. Compute the NPV for Project I at the risk-adjusted cost of capital for the project. Should management adopt this project based on your analysis? Explain. Would your answer be different if the project were determined to be of average risk? Explain. (8 points)
14. Conclude the project with your reflections on what you have learned from this course and how it has affected your view of your own job and career (5 points).
.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M9502354

Have any Question?


Related Questions in Other Engineering

Assignment -problem 1 - given is the lcc difference

Assignment - Problem 1 - Given is the LCC difference equation that represents some LTI system: y(n) - ¾y(n-1) - ¼y(n-2) = x(n) + x(n-1)   a) Find the impulse response of the system (solve the LCCDE). b) Draw a block diag ...

This is your second design assignment this assignment

This is your second design assignment. This assignment requires you to design a complex state machine. You are designing a digital alarm clock. There are various designs you can attempt. More complex designs are worth mo ...

1 online discussion forum - post your proposed topic and

1. Online Discussion forum - Post your proposed topic and chosen data set as well as a short plan for the project. This is required for approval of the topic. As discussed, students must select unique topics, therefore i ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Engineering analysis homework -for every problem provide

Engineering Analysis Homework - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Write a script that solves the problem. For (c), show results of the evaluation of every ind ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Part 1configure verify and troubleshoot wan links and ip

Part 1 Configure, verify and troubleshoot WAN links and IP services Answer to all questions below: 1. What is the name of the Safe Work Australia code of practise that provides guidance on how to manage the risks of elec ...

Conceptual design of forced-free-mixed convection

Conceptual Design of Forced-Free-Mixed Convection Experiment This assessment is to be completed individually. 1. Learning Outcomes: - Develop a basic ability to conceptually design an experimental apparatus - Use theory ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Assessment practical reportproduce a short technical report

Assessment: Practical Report Produce a short technical report in a form consistent with proteomic journals covering the techniques, results and interpretation of your proteomics experiment in the practical classes. The r ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As