What are problems of clock skew?

This is typically because of two causes. The primary is a material flaw that causes a signal to travel faster or slower than imagined. The second is distance: when the signal has to travel the whole length of a circuit, this will likely (depending onto the circuit's size) arrive at diverse parts of the circuit at different times. The clock skew can cause harm into two ways. Assume that a logic path travels by combinational logic through a source flip-flop to a destination flip-flop. When the destination flip-flop receives the clock tick later than the source flip-flop, and when the logic path delay is short sufficient, in that case the data signal might arrive at the destination flip-flop before the clock tick, vanishing there the previous data which should have been clocked by. This is termed as a hold violation since the previous data is not held long adequate at the destination flip-flop to be properly clocked by. When the destination flip-flop receives the clock tick previous than the source flip-flop, then the data signal has which much less time to reach the destination flip-flop before the next clock tick. When this fails to do so, a setup violation happens, so-called since the new data was not set up and stable before the subsequently clock tick arrived. A hold violation is graver than a setup violation since this cannot be fixed by increasing the clock period.

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M9582491

Have any Question?


Related Questions in Computer Engineering

Question how can the security vulnerabilities common with

Question : How can the security vulnerabilities common with wireless networking be handled to mitigate the risks? The response must be typed, single spaced, must be in times new roman font (size 12) and must follow the A ...

A medical researcher is interested in determining whether a

A medical researcher is interested in determining whether a new medication for lung cancer is effective in a group of patients with early-stage disease. Explain what a Type I and Type II error would be in this study. (Be ...

What is the broadcast domain and ports for hubs and

What is the Broadcast Domain and Ports for hubs and bridges?

Why are farmers paid so littlenbspthe price of agricultural

Why are farmers paid so little?  The price of agricultural goods like chickens and coffee has been falling for decades and the share going to farmers has also been falling. What is the "Global division of labor" in food ...

Question 1 assume that you are the project manager for an

Question: 1) Assume that you are the project manager for an upcoming new information systems project designed to replace your organization's old inventory management system. The server and database will also be upgraded. ...

What are the critical issues we must think about while

What are the Critical Issues we must think about while designing a Lexical Scanner? The results of that development, e.g., discuss both process and product.

How much work energy must you do to lift 1 tonne 1000 kg of

How much work energy must you do to lift 1 tonne (1000 kg) of coal from a depth of 500 m to the surface? What fraction of the heat energy in that coal was this? This is a simple calculation of one part of the emergy to t ...

In a standard s - t maximum flow problem we assume edges

In a standard s - t maximum flow problem, we assume edges have capacities, and there is no limit on how much flow is allowed to flow through a node. In this problem, we consider the variant of the maximum flow and minimu ...

Question research different information systems management

Question : Research different information systems management disaster response plans of major organizations that have had to respond to fairly recent disasters. Discuss the results of the organization's recovery efforts.

We are evaluating a project that costs 1120000 has a

We are evaluating a project that costs $1,120,000, has a ten-year life, and has no salvage value. Assume that depreciation is straight-line to zero over the life of the project. Sales are projected at 64,000 units per ye ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As