Ask Other Engineering Expert

Water Resources and Supply Engineering Project - Water Supply System for Almizhar Area

Do parts 4 to 9 Only.

1. Executive Summary

2. Project Description and Background:

  • Water Resources in UAE.
  • The purpose of this project is to provide water supply system for Mirdif area.
  • The area covered by the project (location and size)
  • The extent of the area (as shown in the map)
  • The landuse of the area (residential, Indust., comm., ....etc)
  • The project horizon

3. Water Demand:

3.1. Water consumption rate (Per Capita Demand in litres per day per head)

3.2. Population served.

3.3. Amounts of the different types of consumption

  • Domestic or residential
  • Industrial and commercial
  • Public use (schools, parks ...etc)
  • Fire demand
  • Losses and waste

3.4. Variation in water demand

  • Average daily flow
  • Maximum daily flow
  • Peak hourly flow
  • Total daily demand

4. Water Quality (exercise)

4.1. Water Quality Guidelines (Standards)

4.2. Primary standards

4.3. Secondary Standards

4.4. Gases in water

4.5. Water sampling

4.6. Sampling Frequency

4.7. Water Testing

5. Water Treatment 

  • What is water desalination?
  • Draw a flow chart to show desalination process in your city.
  • Explain each stage and the technique used in it.
  • Define the new terminology you come across.

6. Water Storage

  • Storage Type (underground, surface, or elevated)
  • Capacity
  • Design
  • Materials

7. Water Collection and Distribution

7.1. What is the Source of water for your area? Why this source?

  • Availability
  • Accessibility
  • Cost

7.2. Intake, type, design, size, materials, location? Why?

7.3. Pumps, type, capacity, lift, and discharge? 

7.4. Intake conduit, size, length, and materials? Why?

7.5. Distribution system

  • Lay out
  • Pipes size, type, length
  • Design flow
  • Pressure
  • Appurtenances

8. References

9. Appendices (supporting Charts, layouts, tables, diagrams......etc)

Project Sample -

https://www.dropbox.com/s/ctvfryqavgivf82/Project%20Sample.rar?dl=0

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92539875

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As