Water Network Design Assignment :-

Task

1. Design of Water Supply Network by proprietary hydraulic analysis software.

2. Optimise the design, efficiency and cost of the system.

3. Produce an NPV Cost Analysis

4. Develop an Environment & Third Party Management Plan and Risk Register

Outline:-

Consider this as your submission as Design Engineer to the Developer, Architect. Contractor and City Planner in a bid to win the Project for undertaking Detailed Design by your Engineering Consultancy.

Clearly communicate all assumptions, design decisions and further actions required later at the detailed design stage etc.

Guidelines for Health and Safety Risk Assessment Register
Titles: Purpose, document reference and project, date, sheet number etc

Format: Tabular columns on single A4 sheet

Suggested Headings:
Date Raised
Raised by
Item Reference Number
Activity Element
Potential Hazards
Consequence/Likelihood/Risk Rating
Persons at Risk
Design measures taken to eliminate or reduce the hazard
Information provided about the residual hazards
Actioned by
Date Actioned

Guidelines for NPV Analysis

Key Objective :

To demonstrate full understanding of performing an NPV analysis of two or more competing options for a relevant element of design within the network.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92546077
  • Price:- $120

Guranteed 48 Hours Delivery, In Price:- $120

Have any Question?


Related Questions in Other Engineering

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Engineering analysis assignment -for every problem provide

Engineering Analysis Assignment - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Plot the function f(t) = (x+5) 2 /(4+3x 2 ) for -3 ≤ x ≤ 5. using plot command. Use the ar ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Conceptual design of forced-free-mixed convection

Conceptual Design of Forced-Free-Mixed Convection Experiment This assessment is to be completed individually. 1. Learning Outcomes: - Develop a basic ability to conceptually design an experimental apparatus - Use theory ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

1 online discussion forum - post your proposed topic and

1. Online Discussion forum - Post your proposed topic and chosen data set as well as a short plan for the project. This is required for approval of the topic. As discussed, students must select unique topics, therefore i ...

This is your second design assignment this assignment

This is your second design assignment. This assignment requires you to design a complex state machine. You are designing a digital alarm clock. There are various designs you can attempt. More complex designs are worth mo ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As