Utilize a dataset posted to the course blackboard site along with this assignment (under ‘practice assignments', then ‘PA: Basic Excel Modeling'). The dataset is titled "water_tower_data.xlsx" and supplies the data recorded from the water tower project demonstration day during three previous EGR 101 class sections. Specifically, in the "raw data" sheet, the file gives the following attributes for 28 teams: team number, water tower design type (speed vs. height), time to build tower (sec), tower height (in), number of cups, and number of rows (levels) in the tower. For this assignment, complete the following tasks and then upload your completed

1. Save the "water_tower_data_2013.xlsx" file to your local machine with the following name: PA_YourLastName (e.g., "Bekki.xlsx" or "Smith.xlsx").

2. Copy and columns A and B and E and F from the "raw_data" sheet into the same locations in the "converted_data" sheet. At the end of this operation, columns A, B, E, and F in the "converted_data" sheet should be identical to their counterparts in the "raw_data" sheet.

3. In the "converted_data" sheet, in cell C1, type "time to complete (min)"

4. In the "converted_data" sheet, in cell D1, type "tower height (cm)"

5. Input a formula in cell C2 of the "converted_data" sheet that convert the "time to complete" value in cell C2 of the "raw_data" sheet (and is in seconds) to a corresponding value in minutes. Drag this formula down to cell C29 (on the "converted_data" sheet) so that the same calculation is done for all 28 teams.

6. Input a formula in cell D2 of the "converted_data" sheet that converts the "tower height" value from cell D2 of the "raw_data" sheet (which is in inches) to a corresponding value in centimeters. Drag this formula down to cell D29 (on the "converted_data" sheet) so that the same calculation is done for all 28 teams.

7. In cell G1 on the "converted_data" sheet, type "score".

8. Add a formula in the "score" column that calculates the score for each team based on the following formula, where tower height is given in centimeters, and time to build is given in minutes. (NOTE: this is not the exact formula that will be used on our demonstration day):

S=Nc +5(NL)+(H/t)

where: S =Score

Nc = Number of Cups

NL= Number of Levels

H = Tower 1 leight in centimeters

t = time to build the tower in minutes

Verbally: score = number of cups + 5(numbcr of levels) 4- (tower height / time to build)

9. Insert the text below in the cells on the sheet titled "averages"

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M91410318
  • Price:- $30

Priced at Now at $30, Verified Solution

Have any Question?


Related Questions in Computer Engineering

In a software design meeting in your company your manager

In a software design meeting in your company, your manager says that one of the most important engines of the Record Keeping System you are developing is the Index Sorting Engine. Your coworker quickly jumps in and says ...

Question 1in what ways can a hash value be secured so as to

Question: 1. In what ways can a hash value be secured so as to provide message authentication? 2. Elaborate on the applications, weaknesses and limitations of the hashing algorithms The response must be typed, single spa ...

Compare and contrast static and dynamic efficiency applied

Compare and contrast static and dynamic efficiency applied to the fossil fuel market. Compare and contrast the concepts of resource rent and user cost as applied to this market and the potential differences in optimal ar ...

Question please assist with discussion questions please

Question: Please assist with discussion questions. Please answer following questions with at least 3 paragraph response. Thank you. Access control starts first with assessing risks so you can properly identify potential ...

Question the sunshine health corporation would like you to

Question : The Sunshine Health Corporation would like you to provide an updated explanation and reference guide on 802.11 standards and specifications. Briefly explain the advantages and disadvantages of each. If you loc ...

One of the authors received a credit card bill for 2988 but

One of the authors received a credit card bill for 2,988, but it included a charge of 1,834 that was not valid. Find the values of the absolute and relative errors the absolute value is 1,834 what is the relative errors?

Can someone please wirte a complete algorith in c language

Can someone please wirte a complete algorith in c language that works without any errors on Visual Studio 2015 Given a list of integers, write a C function, similar to the partition process in QuickSort, that will rearra ...

Assume that the hypothetical economy of mo has 8 workers in

Assume that the hypothetical economy of Mo has 8 workers in year 1, each working 1,500 hours per year (50 weeks at 30 hours per week). The total input of labor is 12,000 hours. Productivity (average real output per hour ...

7 years ago crane corporation issued 20-year bonds that had

7 years ago Crane Corporation issued 20-year bonds that had a $1,000 face value, paid interest annually, and had a coupon rate of 7 percent. If the market rate of interest is 5.5 percent today, what is the current market ...

Are there manufacturers and retailers who have taken steps

Are there manufacturers and retailers who have taken steps to reduce their pollution impact, both air quality and industrial pollution, while maintaining a viable place in the market?

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As