Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

Traffic Impact Assessment

Conduct a Traffic Impact Assessment for a proposed development as shown in the following figures, located on North Creek Road with frontage to Henderson Lane and Hutley Drive, Lennox Head. The development comprises of 149 lots plus an integrated housing facility which has 30 lots, resulting in total of 179 residential lots.

2165_map.jpg

The site is currently predominantly cleared land. It is proposed to realign North Creek Road through the subject site, with Hutley Drive extended to intersect with North Creek Road via a four leg roundabout. Henderson Lane will also be realigned to intersect with North Creek Road via a new T junction, to the west of Stoneyhurst Drive. The proposed site layout, shown below, is also provided

2491_map1.jpg

It is assumed that the development will be completed in 2020. A future planning horizon of 10 years from the date of completion should be considered. The impact of the development at the development completion year and at the planning horizon should be assessed.

For each scenario, analyse the operation of the two intersections, Hutley Drive/New North Creek Rd and The Coast Rd/Ballina St/New North Creek Rd, in the AM and PM peak hour. Note that the Hutley Drive/New North Creek Rd is only required to be analysed for the scenarios with the development, as this roundabout will only be constructed as part of the development. If the operation of any existing or proposed intersection is unacceptable, recommendations to achieve acceptable operation (which have been tested in SIDRA) should be included. Thus the report should include details of the form and lane configurations of the intersections at Hutley Drive/New North Creek Rd and The Coast Rd/Ballina St/New North Creek Rd intersections that should be constructed.

The following assumptions apply to the proposed development traffic:

- A directional distribution of development traffic to/from north or south of 50% and 50% respectively. The directional distributions described apply to AM and PM peak volumes, both entering and exiting the development.

- For the development traffic to/from the north, 60% are assumed to use The Coast Rd (i.e. left turn on The Coast Rd for exiting traffic), and 40% assumed to use Ballina Rd (i.e. through movement onto Ballina Rd for exiting traffic).

- For the development traffic to/from the south, 25% are assumed exit the development to the south (i.e. not use the to use The Coast Rd/Ballina St/New North Creek Rd intersection) and utilise Skennars Head Rd, while the remaining 75% are assumed to use The Coast Rd/Ballina St/New North Creek Rd intersection (i.e. left turn onto The Coast Rd for exiting traffic).

- Assume a split for the trip ends for the development of 20% in and 80% out in the AM peak and a 70% in and 30% out in the PM peak.
The following assumptions apply to the background traffic:

- An annual growth of 2% for the existing (background) traffic.

- When distributing the background (existing) volumes at the new Hutley Drive/New North Creek Rd intersection, assume 1/3 from the east (i.e. via the new Hutley Rd connection) and 2/3 from the south (i.e. via the New North Creek Rd).
The following are provided to enable the assessment:

- RTA Guide to Traffic Generating Developments

- AM and PM peak hour turning movements counts for the current The Coast Road/North Creek Road/Ballina Street intersection conducted in March 2013

- The proposed site plan for the development

Traffic Impact Assessment. The report must be more than 10 pages in length (excluding appendices) with an appropriate report structure, including SIDRA results, title pages, tables of contents, references, conclusions and recommendations etc. All assumptions should be well documented in the report, and the traffic volumes for each scenario must be included. Appropriate inclusions and structures of Traffic Impact Assessments were discussed in lectures, with a sample Traffic Impact Assessment provided for information. Use this as a guide only not as a definitive template.

The SIDRA INTERSECTION files containing the clearly identified scenarios used in the report must also be submitted

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91791646
  • Price:- $110

Guranteed 48 Hours Delivery, In Price:- $110

Have any Question?


Related Questions in Other Engineering

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

1 online discussion forum - post your proposed topic and

1. Online Discussion forum - Post your proposed topic and chosen data set as well as a short plan for the project. This is required for approval of the topic. As discussed, students must select unique topics, therefore i ...

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Engineering analysis homework -for every problem provide

Engineering Analysis Homework - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Write a script that solves the problem. For (c), show results of the evaluation of every ind ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Conceptual design of forced-free-mixed convection

Conceptual Design of Forced-Free-Mixed Convection Experiment This assessment is to be completed individually. 1. Learning Outcomes: - Develop a basic ability to conceptually design an experimental apparatus - Use theory ...

Load fault level analysis amp protection design of a remote

LOAD, FAULT LEVEL ANALYSIS & PROTECTION DESIGN OF A REMOTE AREA MICROGRID Assignment Please undertake the following analyses: 1. Calculate the 3-phase fault levels on Bus 2, Bus 3 and Bus 4 with the main supply connected ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As