Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

The load and loss factors are very important in the design of power distribution networks and the reconciliation of electricity purchases. Various methods have been proposed to empirically determine these factors. In this practical, you are provided with raw load data for many different types of end users. The Data is given in excel sheets for the different types of users which include Complexes (low end residents, bulk small residents etc.), office parks and others. Analyse all of the data provided. You are required to do the following:

• Research the different methods to determine load and loss factors as per literature through the creation of a body of knowledge. ?
• Analyse the data that is provided and present your results in the form of an IEEE paper. A template of the IEEE format is included. Maximum length of paper - 10 pages. Your analysis should detail the following: ?
- Typical loads per customer ?
- Opportunities for energy savings for the type of customer ?
- A full analysis of the load models. Describe difference per end user type. Justify your answers with analysis and research.

QUESTIONS THAT SHOULD BE ANSWERED IN THE PAPER

You are required to answer the following questions:
• What loads do you think contribute to each customers load profile?
• After analysing the data, should we consider changing the way in which we design power distribution networks for different types of customers?
• What research directions are being pursued incorporating detailed load profile information?
• How will distributed generation affect the load profile of various customer segments. You are allowed to state your assumptions.

You need to prepare at least 6 pages (double column IEEE format) of information (basically answering the questions in the document on analysing the data in excel sheets - based on loss and load factor).

Need your help to obtain and analyse the load vs time graphs and maximum demand for each case.

The likely data which can be discussed are

-plotting the time Vs load curve from the 30 min profile under each case
-max coincident demand
-demand factor
-utilisation factor
-load factor
-diversity factor
-coincidence factor
- reactive energy
-total energy
-power factor
-average demand
-maximum demand

These can be compared among the types of users to answer the questions.

Attachment:- Research paper.zip

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92793869
  • Price:- $120

Guranteed 48 Hours Delivery, In Price:- $120

Have any Question?


Related Questions in Other Engineering

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Question - show that the zero-point energy of a simple

Question - Show that the zero-point energy of a simple harmonic oscillator does not contribute to its entropy or heat capacity, but does contribute to its energy and Helmholtz function.

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

Engineering analysis homework -for every problem provide

Engineering Analysis Homework - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Write a script that solves the problem. For (c), show results of the evaluation of every ind ...

Engineering analysis assignment -for every problem provide

Engineering Analysis Assignment - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Plot the function f(t) = (x+5) 2 /(4+3x 2 ) for -3 ≤ x ≤ 5. using plot command. Use the ar ...

Introduction to engineering design assignment -

Introduction to Engineering Design Assignment - Drafting Question 1 - Field notes and traverse drawing may be an outdated form of keeping and presenting information on the position of features on a site. Modern electroni ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Projection of planes1 a regular pentagon of 25 mm side has

Projection of Planes 1. A regular pentagon of 25 mm side has one side on the ground. Its plane is inclined at 45° to H.P. and perpendicular to the V.P. Draw its projections. 2. Draw the projection of a circle of 50 mm di ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As