Introduction:

The description below pertains to the project required for CPEG 309 (Advanced Digital Systems). Please note the following carefully:

1) Review the engineering design process requirements at www.iisme.org/etp/HS%20Engineering-%20Engineering.pdf  in detail.

2) Follow the design criteria (as described in the document) and implement a digital system design of your choice all the way to the hardware level.

3) prepare a detailed report about your project describing every design criteria pertinent to your project in detail. Include the following headings:

a) PROBLEM DEFINITION
b) PERTINENT INFORMATION
c) MULIPLE SOLUTIONS
d) ANALYSIS AND SELECTION OF A SOLUTION
e) TESTING AND IMPLEMENTATION OF THE SOLUTION

Goal: The goal is to simulate a real life product development and familiarize students with the design process of a system, component, or process to meet desired needs within realistic constraints such as economic, environmental, social, political, ethical, health and safety, manufacturability, and sustainability.

Requirements:

a) Develop a problem statement - identify the need and criteria for acceptability

b) Collect relevant information for the design.

c) Generate design solutions.

  • combine new ideas, tools and methods
  • use mathematics, science, and engineering as appropriate

d) Analyze design solutions.

  • pick appropriate engineering standards
  • select realistic constraints such as economic, environmental, social, political, ethical, health and safety, manufacturability, and sustainability, and select the best solution

e) Implement the design.

Purpose: The aim is to design and develop a practical device using logic gates and sequential and combinational logic. 

Project Selection
The instructor will identify a few sample projects.  Each team (maximum of two students) must then propose its own project or pick one of the sample projects. At a minimum, a product should include one AND, one OR, and one NOT gate. 

Sample Projects:

Home Security System:

The objective of this project is to design and develop a home security system. The system should have the capability to monitor four different sensors (e.g. motion detector, door entry, window switches, fire alarm). The system will continuously monitor the sensors for a change of state condition (1 to 0 or vice versa). If a change is detected, an alarm goes off.

Two Way Traffic Light:

The objective of this project is to design and develop a digital controller required to control traffic at a busy intersection and an occasionally used side street. The main street is to have a green light for a minimum of 25 seconds or as long as there is no vehicle on the side street. The side street is to have a green light until there is no vehicle on the side street or for a maximum of 25 seconds. There is to be a 4-second caution light (yellow) between changes from green to red on both the main street and the side street.

Synch/Asynch Counter:

The objective of this project is to design and develop a synchronous or asynchronous 3-bit (at least) counter that would count in any order, but normal. Digital counter are made from a series of flip-flops that are clocked together (synchronous) or independently (asynchronous). The modulus of a counter is the number of different output states the counter may take.

Shift Register:

The objective of this project is to design and develop a shift register counter. A shift register is a series of flip-flops connected so that data can be transferred to a neighbor each time the clock pulse is active. An ex is the display of a calculator. As numbers are entered on the keypad, the previously entered numbers are shifted to the left. Shift registers can be made to shift data to the left, to the right, or in either direction, using a control signal.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91332

Have any Question? 


Related Questions in Other Engineering

Assignmentfor the circuit below perform the following1given

Assignment For the circuit below, perform the following: 1. Given an AC input voltage of Vrms = 200Vrms and a sinusoidal frequency of omega = 120pi rad/sec, determine the following: o V1peak (peak value of AC input volta ...

Risk factors and gantt chartsquestion 1 project risk

Risk Factors and Gantt Charts Question 1: Project Risk factors • List the major risk factors for your project and the possible ways to mitigate this risks for your project. Question 2: Resource Evaluation • Produce and c ...

Assignmentdiscussionanalog integrated circuits amp

Assignment Discussion Analog Integrated Circuits & Lab Filter Design Directions: Please answer BOTH of the questions and respond to a minimum of two of your classmates. Question A Discuss the various compromises that mus ...

Power flow project -figure 1 shows a single-line diagram of

Power Flow Project - Figure 1 shows a single-line diagram of a five-bus power system. Input data are given in Tables 1, 2, and 3. As shown in Table 1, bus 1 is the swing bus, to which a generator is connected. Bus 3 is a ...

Crude oil is transported from tank farm in yanbu to the

Crude oil is transported from tank farm in Yanbu to the Power plant of the Electric Company in Rabig by ships. Investigate the feasibiliy of building a pipeline system complete pumping system to transport crude oil from ...

1 summarise the steps in the development of an open pit

1. Summarise the steps in the development of an open pit mine. 2. Define or describe the following terms a. Bench height b. Working bench c. Crest d. Cut e. Toe f. Safety bench/catch bench g. Bench face angle h. Back bre ...

I need a report on what is a robot and also discuss seven

I need a report on what is a robot and also discuss seven criteria of defining a robot ( using the book robot programming a guide of programming autonomous robots) I need 4 pages not including references.

Time managementdiscuss some of the reasons why individuals

Time Management Discuss some of the reasons why individuals routinely over-estimate the time for project activities. How is this behavior detrimental to the schedule and project? Are some of these reasons more prevalent ...

This homework is part of a private kaggle competition in

This homework is part of a private Kaggle competition, in the end we only want to submit an excel file with ID and Expected column, and I need the R code as well to submit. I am attaching the data files, both should be u ...

Labintroductionweek 2 lab is based on half-wave and

Lab: Introduction: Week 2 lab is based on half-wave and full-wave rectifiers. Rectifiers are widely used in power supplies to provide the required DC voltage. Please review the following videos before getting started wit ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Section onea in an atwood machine suppose two objects of

SECTION ONE (a) In an Atwood Machine, suppose two objects of unequal mass are hung vertically over a frictionless

Part 1you work in hr for a company that operates a factory

Part 1: You work in HR for a company that operates a factory manufacturing fiberglass. There are several hundred empl

Details on advanced accounting paperthis paper is intended

DETAILS ON ADVANCED ACCOUNTING PAPER This paper is intended for students to apply the theoretical knowledge around ac

Create a provider database and related reports and queries

Create a provider database and related reports and queries to capture contact information for potential PC component pro

Describe what you learned about the impact of economic

Describe what you learned about the impact of economic, social, and demographic trends affecting the US labor environmen