After installation of a propeller, the engine must be ground run in order to check the propeller for correct function and operation.  Aircraft propeller installations vary considerably, and no set testing procedure would be satisfactory for all aircraft.  It is imperative, therefore, that any particular installation should be tested in accordance with the approved AMM procedure, which will normally include the following general requirements:

  • The engine should normally be fully cowled, and the aircraft should be facing into wind before starting an engine run. It is sometimes recommended that the pitch change cylinder should be primed with oil before starting, by operation of the feathering pump.
  • The safety precautions appropriate to engine ground running should be taken, the controls should be set as required, and the engine should be started.
  • As soon as the engine is operating satisfactorily, and before using high power, the propeller should be exercised in the manner specified in the Maintenance Manual, to establish that the pitch change mechanism is operating.
  • The checks specified in the Maintenance Manual to confirm satisfactory operation of the propeller system, including constant speed operation, feathering, operation of the propeller pitch change throughout its range, synchronisation with other propellers on the aircraft, and operation of associated warning and indicating systems, should be carried out.
  • Engine running time should be kept to a minimum consistent with satisfactory completion of the checks, and a careful watch should be kept on engine temperatures to avoid overheating. With turbine engines, changes to operating conditions should be carried out slowly, to avoid rapid engine temperature changes, and to conserve engine life.
  • When all checks have been successfully carried out, the engine should be stopped, and a thorough inspection of all propeller system components should be carried out, checking for security, chafing of pipes and cables, and signs of oil leaks.
  • Don't forget to complete all paperwork related to the maintenance activity, including Duplicate Inspections.

Note:  If vibration was experienced during the engine run, the hub retaining nut should be re-tightened after the engine shaft has cooled down. 

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M9507638

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As