Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

Telecommunications System Modelling

You are responsible for the planning of roads in a small suburb shown in Figure below. There are 4 intersections, labelled 1 to 4. The outside of this suburb has been represented by areas 0 and 5. Each street segment is named based on the two intersections that it connects to in the direction of traffic flow. For example, s12 is the road segment connecting intersection 1 to intersection 2. The opposite direction would be called s21.

Similarly, s01 connects the left-hand outside area 0 to intersection 1, and s35 connects the intersection 3 to the outside area 5 at the bottom. Some example names for streets are shown on the figure.

233_Figure.jpg

When cars arrive at an intersection, a percentage qL of them turn left, qR turn right, and qS go straight. Also, a percentage qE will leave the street network (going home or to their office). These percentages are the same for all intersections. At the edge of the suburb, the turning cars will re-enter the suburb at the next available street and the ones going straight are recycled back from the other end as shown in the Figure. This is meant to model arrivals from other neighbouring suburbs to this area.

The cars arrive to the system (from houses or offices) at a rate of ?? in each street segment (same rate for all segments) according to a Poisson process.

To model the queue at the intersection, you can use an M/M/k queue, where k is the number of lanes in the street. The cars depart the intersection at the rate of μ cars per second for each lane. In other words, μ is the service rate of each lane (each lane is a server in the terminology of queueing theory). If k > 1 in any intersection, it means that cars have more than one lane so this becomes a multi-server queue. Of course, making streets wider to have more than one lane is very costly, so the aim is to identify the minimum number of lanes that are sufficient to give a reasonable congestion delay for the commuters. Your tasks are as follows:

1- Model this street network as a Jackson queuing network. Identify all relevant parameters of the system.

2- Write down the expressions for the total average delay (W) in the system, as well as other relevant indicators such as the size of queues at intersections. Clearly state any assumptions that you have to make.

3- Discuss how W is related to k. It is expected that as k increases, then the congestion delay is reduced. Is this correct?

4- Solve this problem and obtain W (if a steady state solution exists) for the following numerical example: γ = 2, μ = 8, qL = qR = 0.2, qS = 0.4, qE = 0.2, k = 2. Use Matlab for this purpose and attach your code. Discuss the solution, if it exists or if you needed to make more assumptions in derivation.

5- What range of values of μ will result in a steady state solution for k = 1.

You need to submit a hardcopy report for the above five tasks. Don't write an essay, make it brief and clear. I expect the report to be a maximum of 3 pages (but it is ok if you go a bit above this). Also attach the printout of your code and evidence that you have run the code and obtained the results in part 4.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91991091
  • Price:- $45

Priced at Now at $45, Verified Solution

Have any Question?


Related Questions in Other Engineering

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Assignment -problem 1 - given is the lcc difference

Assignment - Problem 1 - Given is the LCC difference equation that represents some LTI system: y(n) - ¾y(n-1) - ¼y(n-2) = x(n) + x(n-1)   a) Find the impulse response of the system (solve the LCCDE). b) Draw a block diag ...

Part 1configure verify and troubleshoot wan links and ip

Part 1 Configure, verify and troubleshoot WAN links and IP services Answer to all questions below: 1. What is the name of the Safe Work Australia code of practise that provides guidance on how to manage the risks of elec ...

Projection of planes1 a regular pentagon of 25 mm side has

Projection of Planes 1. A regular pentagon of 25 mm side has one side on the ground. Its plane is inclined at 45° to H.P. and perpendicular to the V.P. Draw its projections. 2. Draw the projection of a circle of 50 mm di ...

This is your second design assignment this assignment

This is your second design assignment. This assignment requires you to design a complex state machine. You are designing a digital alarm clock. There are various designs you can attempt. More complex designs are worth mo ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As