Task

Design a tube and shell heat exchanger for the fluids and duty given for you and complete Project Management tasks as detailed below.

Project management tasks

Complete:

- A project scoping form. A short phrased piece of information covering:
o What is to be done
o Why it is to be done
o Value it provides if it is done

- Work Breakdown structure. Identify and sequence tasks.

- Gantt chart - based on the WBS (tasks, durations, and dependencies)

- Risk Assessment - based on the WBS (tasks, durations, and dependencies).

Design Assumptions:

• The overall pressure drop for each fluid should not exceed 10% of that fluid's inlet pressure.
• The hot fluid goes through the tubes, and the cold fluid through the shell.
• The design must include specification of the number of tubes required, and the number of tube passes. You need not go into detail as to the arrangement of baffles on the shell side.
• You may assume the use of tubes of the following specification: length 8.0 m, internal diameter 0.025 m, external diameter 0.027 m, material carbon steel.

• Assume shell-side heat transfer coefficient is a constant: h = 1500 W m K .

• Ignore contribution of fouling, and assume the tube itself has negligible resistance to heat transfer. Thus

3. What to hand in

The order of what you hand in is important.

i) Project management documents
- A project scoping form
- Work Breakdown structure.
- Gantt chart
- Risk Assessment

ii) Data sheet

You should present an absolutely clear summary of your input and output data, set out neatly on a single sheet of A4 paper (known as a data sheet), which will include:

- For both hot and cold fluid, a statement of flows, temperatures, pressures and all relevant physical properties (density, heat capacity, viscosity, thermal conductivity, Prandtl number,.... (others?).

- The heat load of the exchanger in Watt.

- The chemical engineering design of the exchanger in terms of number of tubes, heat transfer surface, passes, and heat transfer coefficient.

A typical shell and tube heat exchanger data sheet can be found on page 6.

iii) A neat sketch of the exchanger, with key dimensions (need not be to scale).
iv) A brief reference (2-3 lines) as to the main sources of data and design methods.

v) Calculations. Check fluid properties with another source/calculate. File your main calculations and if these run to more than 10 sides, please go through and precise them.Task

- Design task

- Design a shell and tube heat exchanger for the fluids and duty given to you.

- Data sheet (see page 6 of the hand-outs).

- A neat sketch of the exchanger, with key dimensions.

- A brief reference (2-3 lines) as to the main sources of data and design methods.

- Calculations.

- Any remarks/conclusions about the HX design.

- Project management documents.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91596598
  • Price:- $150

Guranteed 48 Hours Delivery, In Price:- $150

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As