Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

Systems Engineering for Managers-

Aims:

This assignment aims to give you an opportunity to:

-Identify, interpret and analyse stakeholder needs

-Research and consider an issue of reasonable complexity using the concepts of requirement engineering and Functional Analysis

-Apply tools and techniques considered in class to capture your thoughts and ideas on the topic researched.

Introduction and Requirements:

Buildings can have an extensive direct and indirect impact on the environment, society and economy. The field of sustainable design seeks to balance the needs of these areas by using an integrated approach to create design solutions. Implementation of a Sustainable design helps to reduce, or completely avoid the depletion of critical resources such as energy, water and raw materials and prevent environmental degradation caused by facilities and infrastructure throughout their life cycle.

Retrofitting an existing building can often be more cost- effective than building a new facility. Introduction of sustainable design attributes reduces operation costs and environmental impacts, and can increase building resiliency.

Research the literature on sustainable buildings, and what makes them sustainable. Develop a high level functional architecture, highlighting the functionality a building possesses, including the functionality for it to be called a "green (sustainable) building". Perform a functional allocation by identifying some technologies that you may use to achieve this functionality, and therefore qualify your building as sustainable. Also state the factors used to trade- off these technologies, identified from your literature review. Provide a list of 10 "good" requirements for one or more of the functional areas of your architecture that make the building "sustainable".

2000 words.

8 harvard reference.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91791108
  • Price:- $90

Priced at Now at $90, Verified Solution

Have any Question?


Related Questions in Other Engineering

This is your second design assignment this assignment

This is your second design assignment. This assignment requires you to design a complex state machine. You are designing a digital alarm clock. There are various designs you can attempt. More complex designs are worth mo ...

Conceptual design of forced-free-mixed convection

Conceptual Design of Forced-Free-Mixed Convection Experiment This assessment is to be completed individually. 1. Learning Outcomes: - Develop a basic ability to conceptually design an experimental apparatus - Use theory ...

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Part 1configure verify and troubleshoot wan links and ip

Part 1 Configure, verify and troubleshoot WAN links and IP services Answer to all questions below: 1. What is the name of the Safe Work Australia code of practise that provides guidance on how to manage the risks of elec ...

Assessment practical reportproduce a short technical report

Assessment: Practical Report Produce a short technical report in a form consistent with proteomic journals covering the techniques, results and interpretation of your proteomics experiment in the practical classes. The r ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Question - show that the zero-point energy of a simple

Question - Show that the zero-point energy of a simple harmonic oscillator does not contribute to its entropy or heat capacity, but does contribute to its energy and Helmholtz function.

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering analysis homework -for every problem provide

Engineering Analysis Homework - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Write a script that solves the problem. For (c), show results of the evaluation of every ind ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As