Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Computer Engineering Expert

Systems anlysis

You were first asked to select a system or software application to specify requirements, develop a design using modeling tools, formulate development and testing strategies, and propose an integration and deployment plan. Each week, you contributed with specifications and plans that culminated in an overall Key Assignment System Requirements, Design, and Implementation Specification as follows:

Part 1 Tasks

• System and Application Overview: An overview of the system or software application and intended users

• Requirements Specification: Detailed requirements specification with both functional and nonfunctional requirements

• System and Application Design: A high-level design in the form of use cases and detailed design models utilizing computer-aided software engineering (CASE) tools to represent the data, processes, and interfaces

• Test and Quality Assurance Plan: A test and quality assurance plan that included the various tests and quality control measures that need to be taken into consideration

• Development Strategy: A development strategy that weighs make versus buy or insourcing versus outsourcing acquisition strategies

Make any updates to the content based on feedback from your instructor and your peers. Make sure that the Key Assignment has a good flow and is cohesive in its presentation of information.

Part 2 Tasks

You are given the assignment to craft an integration and deployment plan for your selected application or system that includes the required resources and work breakdown structure of implementation tasks (you may use Visio Software Application where needed).

The project deliverables are as follows:

• Update the System Requirements, Design, and Implementation Specification title page with the new date.
• Update the previously completed sections based on the instructor's and peers' review feedback.
• Integration and Deployment Plan
o Develop an overall work breakdown structure (WBS) for the 7 system development life cycle (SDLC) phases:

- Preliminary Analysis
- System Analysis or Requirements Definition
- System Design
- Development
- Integration and Testing
- Acceptance, Installation, and Deployment
- Operation Support and Maintenance

o Add activities under the first 5 phases that you already performed.
o Add activities that are specific to the final 2 phases in SDLC for deployment and ongoing maintenance and support.

• Name the document "yourname_IT425_IP5.doc."

Please submit your assignment.

For assistance with your assignment, please use your text, Web resources, and all course materials.

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M92045393

Have any Question?


Related Questions in Computer Engineering

Question suppose that a car is moving through a suburban

Question : Suppose that a car is moving through a suburban environment that has a wireless channel with a coherence time of 10 ms and a coherence bandwidth of 600 kHz. The bit rate of the signal being used is 50 kbps. Ch ...

The gravitational attraction between any two objects in the

The gravitational attraction between any two objects in the universe is given by the following formula: Force of Gravity = (G * m * n) / r 2 Where  m  and  n  are masses of the objects in kilograms,  r  is the distance b ...

Objectiveto apply object-oriented methodology for analysis

Objective To apply object-oriented methodology for analysis of information systems development in a case study. Case Study -Chemist ServiceGroup Chemist Service group is a chainof chemiststores. It employs more than8,000 ...

Run sqlplus systemoracle11 and spool to ccis421bs6spooltxt

Run sqlplus system/Oracle11 and SPOOL to c:\cis421b\S6spool.txt User SCOTT, who had the password TIGER, changed it to something more secure, but has since forgotten it. If possible, demonstrate what you as a DBA can do t ...

Make a function last-char that consumes a nonempty string

Make a function last-char that consumes a nonempty string and produces a string consisting of the last character in the original string.

Scheduling algorithms are again becoming more important as

Scheduling algorithms are again becoming more important as we look at operating system that run on mobile devices. Are their scheduling algorithms different from those found on traditional interactive system? Compare and ...

How does having an understanding of spreadsheet software

How does having an understanding of spreadsheet software help you succeed in your personal or professional life?

1 what is the purpose of exclusive gates such as the xor

1. What is the purpose of exclusive gates such as the XOR and XNOR? 2. What function do these gates perform?

We might consider a regression of the number of group

We might consider a regression of the number of group members and the efficiency of project completion. Which of those would be the dependent and which would be the independent variables?

A new machine averages 4 clock cycles per instruction and

A new machine averages 4 clock cycles per instruction, and runs at a system clock of 20 MHz. The Axiom-Verge algorithm set to benchmark the system will take an even 3000 instructions to complete. a) Knowing how many cloc ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As