Part 1: Begin with your group's diagram in Mental Modeler. Finish the model, revising it to be more comprehensive, and demonstrating that you have put thought and effort into the revision. Be sure to identify every relationship as positive or negative and assign a value to the relationship. Categorize the components and assign each category a color in the group pane that shows when you click on a component. Under the Scenario tab, create several scenarios that systematically test the impacts of increasing or decreasing one or more variables. Systematically means first only change things one at a time, before you try any combinations. Choose a scenario that generates interesting results that you are able to explain.

Part 2: Read pages 1-11 in the Introduction to Systems Thinking document by Daniel Kim. Stop after you finish reading the section on delays.

Part 3: Draw a causal loop diagram of some components of your causal map from Part 1. You will need to consider which components could interact as part of a causal loop, and that might require changing the directions of the relationships or adding new components. Draw at least two feedback loops. Continue drawing feedback loops until you have at least one balancing and one reinforcing loop, and that you have incorporated both human and natural components in the loops. Select two feedback loops, one balancing and one reinforcing, and consider whether these interact with each other (they may or may not). If they interact, draw them as part of the same system. Redraw your selected diagrams using illustration software.

Part 4: Write at least one page of text explaining your diagrams. Place your diagrams after the text, referring to your revised causal map as Figure 1, one scenario as Figure 2, and causal loop diagram in Figure 3. Be sure your diagrams include legends and that each has an informative caption. The text must be typed, single spaced with font size between 11 and 12, and checked for spelling and grammar.

Attachment:- Diagram.rar

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92752467
  • Price:- $50

Guranteed 36 Hours Delivery, In Price:- $50

Have any Question?


Related Questions in Other Engineering

Load fault level analysis amp protection design of a remote

LOAD, FAULT LEVEL ANALYSIS & PROTECTION DESIGN OF A REMOTE AREA MICROGRID Assignment Please undertake the following analyses: 1. Calculate the 3-phase fault levels on Bus 2, Bus 3 and Bus 4 with the main supply connected ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Engineering analysis homework -for every problem provide

Engineering Analysis Homework - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Write a script that solves the problem. For (c), show results of the evaluation of every ind ...

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Conceptual design of forced-free-mixed convection

Conceptual Design of Forced-Free-Mixed Convection Experiment This assessment is to be completed individually. 1. Learning Outcomes: - Develop a basic ability to conceptually design an experimental apparatus - Use theory ...

Projection of planes1 a regular pentagon of 25 mm side has

Projection of Planes 1. A regular pentagon of 25 mm side has one side on the ground. Its plane is inclined at 45° to H.P. and perpendicular to the V.P. Draw its projections. 2. Draw the projection of a circle of 50 mm di ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Introduction to engineering design assignment -

Introduction to Engineering Design Assignment - Drafting Question 1 - Field notes and traverse drawing may be an outdated form of keeping and presenting information on the position of features on a site. Modern electroni ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As