The overall aim of this coursework is to construct a simple hydrological model (using MATLAB or Excel) that is able to predict both the volume and timing of runoff from a stormwater planter (or rain garden) in response to an arbitrary rainfall input (i.e. rainfall time-series or design storm). You will then use your model to suggest suitable design dimensions for a specific stormwater planter installation and comment on how effectively the planter performs. We will only consider hydrological performance here (i.e. ignoring considerations relating to water quality, amenity, biodiversity or broader Green Infrastructure).

Design Overview

The Diamond building occupies an area of approximately 1,500 m2. There is a large area of paved open space to the west of the building, between it and the Jessops West building. The University would like to explore the possibility of constructing a stormwater planter (or rain garden) within this space. Assume that all of the rainfall from the Diamond building's roof is currently directed to a combined sewer via an outlet on the western side of the building, which is accessible from above ground.

2115_Figure.png

Process -

Step 1 - Literature Review - identify relevant previous research/guidance.

Step 2 - Develop a stormwater planter rainfall/runoff model, using either MATLAB or Excel.

Step 3 - Apply the model to suggest designs for the two specific design scenarios described below.

Step 4 - Discuss how sensitive the model output is to infiltration rate and evapotranspiration rate. 

Step 5 - Comment on how effective the SuDS you have proposed are in managing stormwater on an annual basis, using the Sheffield 2007 rainfall record as input. For example, what fraction of the annual inflow would be lost to evapotranspiration or infiltration or passed back into the combined sewer?

Model Development -

Use Stovin et al. (2013; 2015) (focusing on retention and detention due to green roofs respectively) as a starting point, but then consider the following differences:

  • Stormwater Planters/Rain Gardens may have a sealed base (with overflow back to the sewer) or infiltrate into the ground; you will need to model both options.
  • Natural infiltration rates vary widely.
  • Stormwater planters accept runoff from adjacent impermeable surfaces; green roofs typically only drain their own surface area.
  • Stormwater planters often have deeper substrates compared with green roofs, and may support bigger plants. How will these differences impact on evapotranspiration rates and on overall retention?
  • Stormwater planters may be designed to accommodate ponding.
  • Your model will need to keep track of the moisture level within the planter.

2394_Figure1.png

Design Scenarios

You should generate two alternative stormwater planter designs - see Options A and B below. Use your model: i) to demonstrate that both designs meet the design storm requirements given in Table 1; and ii) to comment on the annual water balance. You have been provided with the 5-minute rainfall depths for Sheffield for the full year 2007 (on MOLE, Week 1 revision). Rainfall depths for different durations with return periods of 1, 10 and 100 years are provided in Table 1.

Table 1 - Design storm depths (mm) for Sheffield (FEH CD-ROM)

Return Period (years)

Event Duration (hours)

0.25

0.5

0.75

1

2

4

1

3.07

4.26

5.17

5.92

8.22

11.42

10

13.29

17.07

19.77

21.94

28.18

36.21

100

29.55

36.39

41.1

44.81

55.18

67.96

Option A - An Infiltration Planter (Figure 2, left)

This design assumes that soil conditions on the site are favourable for infiltration. Design a planter capable of infiltrating the critical duration 1 in 10 year design event. Temporary ponding of up to 100 mm depth is permitted. 

Option B - A Flow-Through Planter (Figure 2, right)

This design assumes that infiltration at the site is not possible. Design a flow-through planter capable of dealing with the critical duration 1 in 10 year design event. Temporary ponding of up to 100 mm depth is permitted. The outflow from the drainage layer back to the sewer should be restricted to a suitable greenfield runoff rate. Overflow back to the sewer is permitted for events in excess of 1 in 10 years, once a ponding depth of 100 mm is exceeded. 

In each case you need to provide a clear statement and/or engineering drawing of the planter design dimensions. You also need to include graphs showing how both the outflow(s) and the moisture depth within the planter vary during the design storm. All design assumptions (including the storm profile peakedness selected, time-step, initial moisture content, infiltration rates & evapotranspiration rates) should be stated and justified.

Further discussion of option A should consider the following:

a) How sensitive is the design to infiltration rate? - You should explore both 'typical' infiltration rates and also consider what values might be expected for this specific site.

b) How sensitive is the design to the evapotranspiration rate? What fraction of the annual inflow to the planter would be removed due to evapotranspiration?

c) Comment on how the design will respond to events larger than the critical design storm.

d) Any other aspects you feel are relevant.

Further discussion of Option B should consider the following:

a) How sensitive is the design to the green field runoff rate?

b) How sensitive is the design to the evapotranspiration rate? What fraction of the annual inflow to the planter would be removed due to evapotranspiration?

c) How effective is the design in attenuating runoff peaks, both for the design and routine storms?

d) Any other aspects you feel are relevant.

Assessment Criteria -

1. Literature Review. Undertake a focused review of relevant literature.

2. Model. Develop a one-dimensional hydrological model capable of predicting runoff from - and moisture levels within - a stormwater planter in response to an arbitrary (design or time-series) rainfall input.

3. Design. Apply the model to design two different types of stormwater planter to meet prescribed performance targets.

4. Exploration. Use the model to generate a deeper understanding of how stormwater planter performance is affected by key input variables.

5. Communication. Communicate findings in a clear and focused report.

Assignment Files - https://www.dropbox.com/s/6z9vhonc2j6biqr/Assignment%20Files.rar?dl=0

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92231599
  • Price:- $140

Guranteed 48 Hours Delivery, In Price:- $140

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As