Smart Grid Fundamentals Coursework Assignment

Part 1 - Microgrid design

This part of the coursework consists of the design of a large microgrid that can supply a DC load. Your goal is to design a microgrid that can operate exclusively on renewable energy.

To do so you will need the following information:

- Assume that all days in the year are the same, and within each day there are four time periods, with the properties shown in Table 1.1.

- Solar PV can be built for a capital cost of £2000/kW (all costs included)

- Wind can be built for a capital cost of £1500/kW (all costs included)

- Battery storage can be built for £400/kWh + £100/kW. For example, the capital cost to build a 10 kW storage plant that can store 20 kWh, will be: 20kWh x £500/kWh + 10kW x £100/kW = £11, 000

Assume that battery storage system will have a round trip efficiency of 85%.

The allowed depth of discharge of the battery is 80%. This means that the state of charge of the battery should not be allowed to go below 20%.

Assume that the operating costs for the resulting system are negligible, that the system will last for 25 years, and that you can obtain a 25 year loan at 5% interest for this project.

Table 1.1: Load, wind and solar data

Time

Load (kW)

Wind (kW/kW)

Solar (kW/kW)

12am-6am

10

0.90

0.05

6am-12pm

20

0.30

0.40

12pm-6pm

25

0.20

0.40

6pm-12am

15

0.60

0.05

Note that in Table 1.1, kW/kW refers to generated output (in kW) per unit of installed capacity (in kW).

Given these assumptions, you are required to:

a) Give an expression for the total initial cost of the microgrid.

b) Calculate a suitable value of the battery capacity and power rating considering its efficiency and allowed depth of discharge. Use manufacturer's data for actual lead acid batteries to select a battery bank that can be purchased in the market and that is reasonably close to your calculations.

c) Provide a charge/discharge schedule for the battery. Note that in order for the schedule to be a feasible solution, the amount of energy in the battery will need to be the same at the beginning and the end of each day (since this pattern repeats day after day).

d) Calculate a suitable power rating of the wind generator. Use manufacturer's data for actual DC wind generators to select a power rating that can be purchased in the market and that is reasonably close to your calculations.

e) Calculate a suitable power rating of the solar PV system. Use manufacturer's data for actual PV panels to select a power rating that can be purchased in the market and that is reasonably close to your calculations. Specify how many panels would be required.

f) What would be the total initial cost of the microgrid? Can this cost be reduced to a minimum? If so, explain how and provide calculations to support your answer.

g) Calculate the annual loan repayment amount, given the total initial cost, the loan period of 20 years and the annual interest rate of 5% for the configuration that you found to give the minimum initial cost.

h) What would be the minimum price in £/kWh at which the generated energy can be sold to the customer to recover the annual loan repayment amount given the total annual load in kWh?

i) Discuss your solution. What factors might have changed your answer?

In the report, please ensure that you:

1. Clearly explain your method (including computer code, if appropriate). Explain your equations.

2. Clearly describe your solution, paying particular attention to ensure that your solution is feasible. Use tables and, if appropriate, graphics to present your results. Show what each resource is doing during each of the four time periods.

Part 2 - Economic dispatch and optimal power flow analysis

2.1 - Power system data

Consider that in a simple power system there are four power plants. The generating plants capacity, type and marginal costs are:

1. 1100 MW nuclear plant with marginal cost of £10/MWh, connected to bus 1.

2. 600 MW coal plant with marginal cost of £20/MWh, connected to bus 2.

3. 400 MW natural gas plant with marginal cost of £30/MWh, connected to bus 3.

4. 100 MW of diesel units marginal cost of £150/MWh, connected to bus 5.

Every day there are four 6-hour periods of demand:

  • 12am-6am: 800 MW
  • 6am-12pm: 1200 MW
  • 12pm-6pm: 1920 MW
  • 6pm-12am: 1600 MW

The system consists of a network with 5 buses. The load above is distributed evenly among the five buses. The transmission lines (branches) have the data shown in Table 2.1.

Table 2.1: Transmission line data

From Bus

To Bus

R

X

Power limit (MW)

1

2

0

0.1

400

1

3

0

0.1

400

2

3

0

0.1

400

2

5

0

0.1

300

3

4

0

0.1

300

4

5

0

0.1

300

Given this information, do the following.

2.2 - Economic dispatch / power flow problem

a) Solve the simple economic dispatch problem for each time period. Report the system marginal price.

b) Solve the DC power flow problem for this system at each time period.

c) For each time period report (in a table) the flows on the transmission lines for your solution.

2.3 - Optimal power flow

a) Solve the optimal power flow problem for this system at each time period.

b) For each time period report (in a table) the flows on the transmission lines for your solution.

c) For each time period report (in a table) the locational marginal prices (LMPs).

2.4 - Discussion

a) What is the impact on this power system of having transmission line constraints?

b) How might smart grid technology impact this power system?

c) How should this system be upgraded to improve its operation?

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92749703
  • Price:- $80

Guranteed 48 Hours Delivery, In Price:- $80

Have any Question?


Related Questions in Other Engineering

Projection of planes1 a regular pentagon of 25 mm side has

Projection of Planes 1. A regular pentagon of 25 mm side has one side on the ground. Its plane is inclined at 45° to H.P. and perpendicular to the V.P. Draw its projections. 2. Draw the projection of a circle of 50 mm di ...

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

1 online discussion forum - post your proposed topic and

1. Online Discussion forum - Post your proposed topic and chosen data set as well as a short plan for the project. This is required for approval of the topic. As discussed, students must select unique topics, therefore i ...

Load fault level analysis amp protection design of a remote

LOAD, FAULT LEVEL ANALYSIS & PROTECTION DESIGN OF A REMOTE AREA MICROGRID Assignment Please undertake the following analyses: 1. Calculate the 3-phase fault levels on Bus 2, Bus 3 and Bus 4 with the main supply connected ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

This is your second design assignment this assignment

This is your second design assignment. This assignment requires you to design a complex state machine. You are designing a digital alarm clock. There are various designs you can attempt. More complex designs are worth mo ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As