SCOPE

Frequently an engineer is given the assignment to develop test procedures for new equipment that has been received.  The engineer's job may be a test engineer's job in a test or maintenance facility or the assignment is for training.  The scope of the project is to design a test procedure for a voltage transformer knowing limited nameplate information about it.  This part of the course will satisfy the requirement for the design portion and term project of the course.

PROBLEM

You have been given a transformer with the following information:

  • Nameplate KVA is 50KVA
  • Voltage  levels are 7200/240/120VAC
    • (the 240 V secondary is center tapped to give 120VAC(line-to-neutral)
  • Frequency is 60Hz

Develop a series of step by step tests to measure and or calculate transformer parameters that would be suitable for publishing in a certified test report.  To be specific, the following data should be measured or calculated:

  • Resistance of the high voltage winding
  • Resistance of the low voltage winding
  • High voltage side current for no load and full load tests OR Low voltage side current for no load and full load tests
  • No load losses at nominal voltage
  • Full load losses at nominal current
  • Percent excitation current
  • Percent Z at room temperature
  • Percent R at room temperature
  • Percent X at room temperature
  • Percent regulation at 100% power factor
  • Percent regulation at 80% power factor
  • Efficiency at loads of 50%, 100%
  • Polarity indications for the high voltage and low voltage winding

To find one or more of these parameters you will have to provide:

  • Bill of Material for each test with chosen instrument model numbers, equipment accuracy specifications, and data sheets
  • Equipment wiring diagram (a pictorial) showing equipment interconnection FOR EACH TEST
  • A step by step procedure stating what you are testing, why you are testing it, and what data you expect to record
  • What engineering formulas are required to calculate requested data.

Question about the project:

For the efficiencies of the transformer, what power factor are we assuming for the load? Also No load losses are the same as the losses in the Core resistance under open circuit test, correct?  Also do we have to do test for both the 120 tap and 240 tap?

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91527166
  • Price:- $60

Priced at Now at $60, Verified Solution

Have any Question?


Related Questions in Other Engineering

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Projection of planes1 a regular pentagon of 25 mm side has

Projection of Planes 1. A regular pentagon of 25 mm side has one side on the ground. Its plane is inclined at 45° to H.P. and perpendicular to the V.P. Draw its projections. 2. Draw the projection of a circle of 50 mm di ...

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

1 online discussion forum - post your proposed topic and

1. Online Discussion forum - Post your proposed topic and chosen data set as well as a short plan for the project. This is required for approval of the topic. As discussed, students must select unique topics, therefore i ...

Conceptual design of forced-free-mixed convection

Conceptual Design of Forced-Free-Mixed Convection Experiment This assessment is to be completed individually. 1. Learning Outcomes: - Develop a basic ability to conceptually design an experimental apparatus - Use theory ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As