SCOPE

Frequently an engineer is given the assignment to develop test procedures for new equipment that has been received.  The engineer's job may be a test engineer's job in a test or maintenance facility or the assignment is for training.  The scope of the project is to design a test procedure for a voltage transformer knowing limited nameplate information about it.  This part of the course will satisfy the requirement for the design portion and term project of the course.

PROBLEM

You have been given a transformer with the following information:

  • Nameplate KVA is 50KVA
  • Voltage  levels are 7200/240/120VAC
    • (the 240 V secondary is center tapped to give 120VAC(line-to-neutral)
  • Frequency is 60Hz

Develop a series of step by step tests to measure and or calculate transformer parameters that would be suitable for publishing in a certified test report.  To be specific, the following data should be measured or calculated:

  • Resistance of the high voltage winding
  • Resistance of the low voltage winding
  • High voltage side current for no load and full load tests OR Low voltage side current for no load and full load tests
  • No load losses at nominal voltage
  • Full load losses at nominal current
  • Percent excitation current
  • Percent Z at room temperature
  • Percent R at room temperature
  • Percent X at room temperature
  • Percent regulation at 100% power factor
  • Percent regulation at 80% power factor
  • Efficiency at loads of 50%, 100%
  • Polarity indications for the high voltage and low voltage winding

To find one or more of these parameters you will have to provide:

  • Bill of Material for each test with chosen instrument model numbers, equipment accuracy specifications, and data sheets
  • Equipment wiring diagram (a pictorial) showing equipment interconnection FOR EACH TEST
  • A step by step procedure stating what you are testing, why you are testing it, and what data you expect to record
  • What engineering formulas are required to calculate requested data.

Question about the project:

For the efficiencies of the transformer, what power factor are we assuming for the load? Also No load losses are the same as the losses in the Core resistance under open circuit test, correct?  Also do we have to do test for both the 120 tap and 240 tap?

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91527166
  • Price:- $60

Priced at Now at $60, Verified Solution

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As