Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

Round off your results appropriately in each case. Work without appropriate UNITS will be returned without grading.

Note: Total allowable settlement = 25 mm.

Q1. Fig.1 shows the soil profile and Table below shows the SPT N data. Bore hole size = 100 mm. Standard split spoon sampler and standard energy were applied for SPT tests.

Apply rod-length corrections, and overburden stress correction. Determine (N1)60, estimate relative density Dr, friction angle Φ', and modulus E and plot all of them in a figure. Depth must be plotted increasing downward in the figure. Appropriate scale must be used for axes.

Q2. Determine the allowable bearing stress qall based on both, tolerable settlement and ultimate bearing capacity qult with at least FS=3, for the following cases (a) to (c).

Use (a) Terzaghi & Peck method, as well as (b) Schmertmann's method (use simplified Iz diagram) for settlement calculations. Ignore creep settlement.

a) Strip Footing, B= 1.75m, Depth of embedment = 1m.

b) Rectangular Footing: B=1.75m, L=2B, Depth of embedment = 1m.

c) Circular Footing (same cross sectional area as (b)). Depth of embedment = 1m.

d) Determine the allowable Load Q for a, b, and c. Depth of embedment = 1m. Neatly tabulate your results.

Fig.1: Soil Profile at a Site

Sand

Assume moist unit weight = 16.4 kN/m3

Ground water (1m below ground level), Assume saturated unit weight = 18.5 kN/m3;

Unit weight of water = 9.81 kN/m3

Bedrock at 15m depth

Depth

  SPT

m

Nm

0

 

1

10

2

12

3

16

4

8

5

10

6

12

7

15

8

13

9

16

10

20

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91982924

Have any Question?


Related Questions in Other Engineering

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Engineering analysis assignment -for every problem provide

Engineering Analysis Assignment - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Plot the function f(t) = (x+5) 2 /(4+3x 2 ) for -3 ≤ x ≤ 5. using plot command. Use the ar ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

Assignment -problem 1 - given is the lcc difference

Assignment - Problem 1 - Given is the LCC difference equation that represents some LTI system: y(n) - ¾y(n-1) - ¼y(n-2) = x(n) + x(n-1)   a) Find the impulse response of the system (solve the LCCDE). b) Draw a block diag ...

Load fault level analysis amp protection design of a remote

LOAD, FAULT LEVEL ANALYSIS & PROTECTION DESIGN OF A REMOTE AREA MICROGRID Assignment Please undertake the following analyses: 1. Calculate the 3-phase fault levels on Bus 2, Bus 3 and Bus 4 with the main supply connected ...

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

Introduction to engineering design assignment -

Introduction to Engineering Design Assignment - Drafting Question 1 - Field notes and traverse drawing may be an outdated form of keeping and presenting information on the position of features on a site. Modern electroni ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As