(a) Comment on the general structure of the IAS Computer, illustrate your answer using a diagram.

(b) (i) Define CPU time.

(a) (ii) A program runs in 10 seconds on a computer A, which has a 100 MHZ clock. A designer has to build a machine B that will run the same program in 6 seconds. The designer has determined that a substantial increase in clock rate is possible, but this will affect the rest of the CPU design, causing machine B to require 1.2 times as many clock cycles as machine A for this program. What clock rate should the designer target?

(c) Explain what is meant by a "bus". Name the two types of buses and give a brief description of both.

(d) Explain with the help of a diagram how to accommodate interrupts in an instruction cycle.

1. (e) In respect of computer disks, explain the terms:
(i) Sector,
(ii) Track,
(iii) Cylinder.

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M9590509

Have any Question?


Related Questions in Computer Engineering

Suppose we are given a directed graph g v e a set of nodes

Suppose we are given a directed graph G = (V, E), a set of nodes A V (denoted as people) and a set of nodes B V (denoted as exit). Assume A and B are disjoint. We want to find a schedule such that every person can escape ...

Question suppose that you receive an email from someone

Question : Suppose that you receive an email from someone claiming to be Alice, and the email included a digital certificate that contains M = ("Alice", Alice's public key) and [h(M)]_CA, where CA is a certificate author ...

A researcher working at a particular company wants to know

A researcher working at a particular company wants to know if workers' health would improve if they were given extra days 'off. In this company, all workers undergo a standard physical exam twice a year and after each ex ...

Assessment details part 1 design documentation and peer

Assessment Details: Part 1: Design Documentation and Peer Review This stage requires you to select a problem to solve using one of the available Mindstorms Robots, design a possible solution to this problem and submit th ...

Does bmw have a guided missile corporate culture and

Does BMW have a guided missile corporate culture, and incubator corporate culture, a family corporate culture, or an Eiffel tower corporate culture?

Why the ytms of bond and zero coupon yields are different

Why the YTMs of bond and Zero coupon yields are different for the same term.

You get hired as a machine learning expert at moviescom

You get hired as a Machine learning expert at movies.com. Your task on day one is to improve the performance of a classifier. You divide the data into 2 parts training, and testing. You learn a model from the training da ...

An equally weighted portfolio consists of 64 assets which

An equally weighted portfolio consists of 64 assets which all have a standard deviation of 0.276. The average covariance between the assets is 0.106. Compute the standard deviation of this portfolio. Please enter your an ...

Question 1 identify all the dfd data flow diagram elements

Question: 1. Identify all the DFD (data flow diagram) elements (Shostack, 2014, p.531.). 2. Identify all threat types to each element(Shostack, 2014, p.531.). 3. Identify threats (three or more), one each for data flow, ...

Sometimes during the manufacturing of an integrated circuit

Sometimes during the manufacturing of an integrated circuit, wires-including control signal wires-are accidentally connected to +V or GND, resulting in a control signal that is stuck-at-1 (when connected to +V) or stuck- ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As