Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Computer Engineering Expert

Question: You have just started your new job as a junior programmer at Wrigh's Design House. The Project Manager has asked you to develop a program to determine the estimated time needed to complete a design project.

To evaluate the estimated time the Design House uses the calculations entered for an optimistic time, a realistic time and a pessimistic time. The program allows the staff to enter and keep track of the number of projects, then prints the results based on the data entered.

Data Entry

A five digit project number

A two digit optimistic time

A two digit realistic time

A two digit pessimistic time

Data Output

Each project number

The optimistic time

The realistic time

The pessimistic time

The expected time use the formula ET = ( OT + 4RT + PT) / 6

The total number of projects and the activity that takes the longest time and the activity that takes the shortest time.

Rationalize your answer by math, measurement or example, something convincing.

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M91296766

Have any Question?


Related Questions in Computer Engineering

Question suppose users share a 1 280 kbps link also suppose

Question : Suppose users share a 1, 280 kbps link. Also suppose each user requires 64 kbps when transmitting, but each user transmits only 10% of the time. (See the discussion of statistical multiplexing in Section 1.3.) ...

Question how can the security vulnerabilities common with

Question : How can the security vulnerabilities common with wireless networking be handled to mitigate the risks? The response must be typed, single spaced, must be in times new roman font (size 12) and must follow the A ...

What is the purpose of load balancing i need full

What is the purpose of load balancing? (I need full explanation) I already know what load balancing is, I just need to know why we use it

Assume you have been selected to build a system for

Assume you have been selected to build a system for Oil&Gas company. Do you prefer to build a win-based system or a web-based system? Why?

Current system analysis and modelling assignment 1

Current System Analysis and Modelling Assignment 1 - Assignment overview - This assignment aims to produce a requirements document that captures the functional requirements for an information system that supports the cur ...

Assignmentthe rebel alliance has secretly been linking

Assignment The Rebel Alliance has secretly been linking planets together via a series of unstable wormholes to enable escape from the Imperial Fleet. The following table lists the wormholes together with the number of pe ...

What are information silos what are the problems caused by

What are information silos? What are the problems caused by information silos? How organizations can solve the problems caused by information silos?

A set of coins makes change fornbspnnbspif the sum of the

A set of coins makes change for n if the sum of the values of the coins is n. For example, if you have 1-cent, 2-cent and 4-cent coins, the following sets make change for 7: 7 1-cent coins 5 1-cent, 1 2-cent coins 3 1-ce ...

Create a class named horse that contains data fields for

Create a class named Horse that contains data fields for the name, color, and birth year. Include get and set methods for these fields. Next, create a subclass named RaceHorse, which contains an additional field that hol ...

Select one of the discussion topics and respond begin your

Select one of the discussion topics and respond. Begin your response by indicating which question you chose. Discussion topics: Section 4.1 Would you prefer a class in which 10 percent get A's and everyone competes for g ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As