Question: If the cost of brick construction in place is $880 per 1000 bricks, estimate the cost of the brick exterior wall for the following building. The building is rectangular with a perimeter of 100 ft (30.5 m). The wall is 8 ft (2.44 m) high with one opening 36 X 80 in. (914 X 2032 mm) and 10 openings 30 X 48 in. (762 X 1220 mm). The brick is 3% X 2x; X 8 in. (95 X 57 X 203 mm) laid in running bond, double wythe.

Engineering Mathematics, Engineering

  • Category:- Engineering Mathematics
  • Reference No.:- M92287027

Have any Question?


Related Questions in Engineering Mathematics

Numerical analysis assignment -q1 define the following

Numerical Analysis Assignment - Q1. Define the following terms: (i) Truncation error (ii) Round-off error Q2. Show that if f(x) = logx, then the condition number, c(x) = |1/logx|. Hence show that log x is ill-conditioned ...

Question a suppose that you are given an instance of the

Question : (a) Suppose that you are given an instance of the MST problem on a graph G, with edge weights that are all positive and distinct. Let T be the minimum spanning tree for G returned by Kruskal's algorithm. Now s ...

Question suppose g is an undirected connected weighted

Question : Suppose G is an undirected, connected, weighted graph such that the edges in G have distinct edge weights. Show that the minimum spanning tree for G is unique.

Assignment - lp problemsthe data for all the problems in

Assignment - LP problems The data for all the problems in this HW are included in the LP_problems_xlsx spreadsheet Problem 1: Cash Planning A startup investment project needs money to cover its cash flow needs. At the en ...

Assignment - introduction to math programmingdirections

Assignment - Introduction to Math Programming Directions - Formulate a linear programming model for the following description. Include definitions of decision variables, Objective function, and constraints. Augment your ...

Problem 1given a sequence xn for 0lenle3 where x0 1 x1 1

Problem # 1: Given a sequence x(n) for 0≤n≤3, where x(0) = 1, x(1) = 1, x(2) = -1, and x(3) = 0, compute its DFT X(k). (Use DFT formula, don't use MATLAB function) Use inverse DFT and apply it on the Fourier components X ...

Assignment - lp problemsthe data for all the problems in

Assignment - LP problems The data for all the problems in this HW are included in the LP_problems_xlsx spreadsheet. Problem 1 - Cash Planning A startup investment project needs money to cover its cash flow needs. At the ...

All these questions should be answered in matlab 1 generate

All these questions should be answered in MATLAB !!! 1. Generate a set of 3 random patterns of dimension 12 where each value is +1 or -1.(3 random 12*12 matrix) 2. Create a 12-unit Hopfield network (a 12x12 matrix) from ...

Clculus assignment -q1 find the total differential of w

CALCULUS ASSIGNMENT - Q1. Find the total differential of w = x 3 yz + xy + z + 3 at (x, y, z) = (1, 2, 3). Q2. Find the value of the double integral ∫∫ R (6x + 2y 2 )dA where R = {(x, y)| - 2 ≤ y ≤ 1, y 2 ≤ x ≤ 2 - y. Q3 ...

Show all your work not just the answerswhen you multiply 21

(SHOW ALL YOUR WORK, not just the answers) When you multiply: 21 x 68 you most likely do: 8x1 + 8x20 + 60x1 + 60x20 = 1, 428 So, there are 4 multiplications and then 3 additions. How long would it take a computer to do t ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As