Question: Consider the filming of the scene described in Problem. Based on past experience, the director is not very confident about the time estimates for some of the activities. The director's estimates for the minimum, most likely, and maximum times for these activities are

Activity                a              m                 b

F                       2            3             12

I                        1            2              8

J                        3            4             10

K                            1            2              7

a. Including these PERT time estimates, how long is the filming expected to take?

b. What is the probability that the number of days required to complete the filming of the scene is at least 30 percent larger than the answer you found in part (a)?

c. For how many days should the director plan in order to be 95 percent confident that the filming of the scene is completed?

Problem: A scene is being shot for a film. A total of 11 distinct activities have been identified for the filming. First, the script must be verified for continuity, the set erected and decorated, and the makeup applied to the actors. After the set is completed, the lighting is set in place. After the makeup is applied, the actors get into costume. When these five activities are completed, the first rehearsal of the scene commences, which is followed by the second scene rehearsal with the cameraperson. While the rehearsals are going on, verifications of the audio and the video equipment are made. After both rehearsals and verifications are completed, the scene is shot. Afterward, it is viewed by the director to determine if it needs to be reshot. The list of the activities and the activity times is

554_Activity 2.png

a. Develop a network for the filming of the scene.

b. Compute the earliest and the latest finishing and starting times for each of the activities, and identify the critical path.

c. Draw the Gantt chart for this project. Assume that activities with slack are scheduled so that there is equal slack before and after the activities.

d. Suppose that the video verification (G) shows that the equipment is faulty. Four additional days are required to obtain and test new equipment. How much of a delay in the total time required to film the project will result?

e. One of the costumes is damaged as it is being fitted (activity E). How much extra time is available for repair without delaying the project?

f. What kind of delays can you envision as a result of the uncertainty in the time of activity K?

g. Solve this problem by linear programming.

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M92278305

Have any Question?


Related Questions in Computer Engineering

Answer the following question what is a remote procedure

Answer the following Question : What is a 'Remote Procedure Call (RPC)'? How a RPC is originated and what are the applications/examples of a RPC process? The response must be typed, single spaced, must be in times new ro ...

Making note of the differences and similarities between a

Making note of the differences and similarities between a non-profit vs a for-profit organization, i.e. the user experience, the style and content what would the differences and simliarities be? I do need something to ba ...

Prove the sieve of eratosthenes algorithm has runtime

Prove the Sieve of Eratosthenes algorithm has runtime complexity ≤ O(n log log n). Sieve Input: an integer n > 1. Let A be an array of Boolean values, indexed by integers 2 to n, initially all set to true. for i = 2,3,4, ...

String firstnamearraychar gradearrayassuming that this text

String firstName[ARRAY]; char grade[ARRAY]; Assuming that this text file is already inputted into the program. Write a loop that will display the students that have "A" or "B" next to their names. If the stuent has a "A" ...

Sql using oraclethe task is to remove suffix from last name

SQL using Oracle. The task is to remove suffix from last name column (e.g. Smith Sr. or Stevens Jr.) and put into the preexisting suffix column in the DB. Final result needs to be in the last name column: Smith or Steven ...

Question suppose we perform a sequence of n operations on a

Question : Suppose we perform a sequence of n operations on a data structure in which teh ith operation costs i 2 of i is an exact power of 2 and 1 otherwise. Use aggregrate analasys and accounting method to determine th ...

Determine the mass of the water by using the waters density

Determine the mass of the water by using the water's density (specific to the initial temperature) and the volume of the water. Remember,  density = mass/volume . You can look up the density of the water at your specific ...

Stock portfolio gui projectgoalyou are to write a gui

Stock Portfolio GUI Project Goal You are to write a GUI program that will allow a user to buy, sell and view stocks in a stock portfolio. For example, you might track the profit or loss on the trades. You might allow for ...

Question suppose you want to perform two sums one is a sum

Question : Suppose you want to perform two sums: one is a sum of 10 scalar variables, and one is a matrix sum of a pair of two-dimensional arrays, with dimensions 10 by 10. What speed-up do you get with 10 versus 100 pro ...

Coa assignment task -q1 a the fibonacci numbers are the

COA Assignment Task - Q1. (a) The Fibonacci numbers are the numbers in the following integer sequence, called the Fibonacci sequence, and are characterised by the fact that every number after the first two is the sum of ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As