Q1. Write the math program for the following bids in the lane procurement auction. Clearly define the variables, constraint and objective function

LANES                   SUPPLIER I          SUPPLIER II         NUMBER OF TRUCKLOAD

X -> Y                    570                            525                            10

Y -> Z                    621                            610                            10

X -> Z                    475                            500                            10

Include the additional constraints:

1) A minimum of 20% of volume for both the suppliers.

2) The following capacity constraints:

LANES                   SUPPLIER I          SUPPLIER II        

X -> Y                     2                              100                        

Y -> Z                     100                         4                             

X -> Z                     100                         2                             

3) Each supplier should get atleast 25% of the business (dollar value)

Solve the three model including the three constraints. Write the math program along with the constraints. Attach the Excel output and the answers (best value for variables and total cost).

Q2. Which of the following lanes can be combined in a combinatorial auction? Why?

X -> Y

Y -> Z

X -> Z

Q3. Who should win the bids for the following lanes in a combinatorial auction? Why? Which will be the winning bids?

LANES  

_________________________________________________________________

X -> Y                                     1                                              1              1

Y -> Z                                                     1                              1

Y -> X                                                                     1                              1

_________________________________________________________________

BID SUPPLIER I                  280         276         350         412         508

BID SUPPLIER II                 255         301         327         401         525

1. Find the approximate minimum cost flow for the following network using the math program discussed in class.

368_Fig.png

The distribution cost per ton for the arcs are as follows

1-4  = $ 280          1-5 = $ 325           4-6 = $ 75             4-7 = $ 220

2-4 = $ 175           2-5 = $ 175           5-6 = $ 150           5-7 = $ 100

3-4 = $ 250           3-5 = $ 225

The capacity of the warehouses are 400 units.

The minimum cost flow from suppliers to customers must use the warehouses. Hence ignore all the direct arcs from suppliers to customers. The supplier capacity and customer demands are listed in the figure. Write the math program along with the constraints. Attach the Excel output and the answers (best value for variables and total cost).

Engineering Mathematics, Engineering

  • Category:- Engineering Mathematics
  • Reference No.:- M91980270

Have any Question?


Related Questions in Engineering Mathematics

Numerical analysis assignment -q1 define the following

Numerical Analysis Assignment - Q1. Define the following terms: (i) Truncation error (ii) Round-off error Q2. Show that if f(x) = logx, then the condition number, c(x) = |1/logx|. Hence show that log x is ill-conditioned ...

Q undirected vs directed connectivitya prove that in any

Q: Undirected vs. directed connectivity. (a) Prove that in any connected undirected graph G = (V, E) there is a vertex v ? V whose removal leaves G connected. (Hint: Consider the DFS search tree for G.) (b) Give an examp ...

Question 1 - many spas many componentsconsider 4 types of

Question 1 - Many spas, many components Consider 4 types of spa tub: Aqua-Spa (or FirstSpa, or P1), Hydro-Lux (or SecondSpa, or P2), ThirdSpa (or P3) and FourthSpa (or P4), with the production of products P1, ..., P4 in ...

Problem 1given a sequence xn for 0lenle3 where x0 1 x1 1

Problem # 1: Given a sequence x(n) for 0≤n≤3, where x(0) = 1, x(1) = 1, x(2) = -1, and x(3) = 0, compute its DFT X(k). (Use DFT formula, don't use MATLAB function) Use inverse DFT and apply it on the Fourier components X ...

Clculus assignment -q1 find the total differential of w

CALCULUS ASSIGNMENT - Q1. Find the total differential of w = x 3 yz + xy + z + 3 at (x, y, z) = (1, 2, 3). Q2. Find the value of the double integral ∫∫ R (6x + 2y 2 )dA where R = {(x, y)| - 2 ≤ y ≤ 1, y 2 ≤ x ≤ 2 - y. Q3 ...

Math assignment -q1 let fx -x3-cosx and p0 1 use newtons

Math Assignment - Q1. Let f(x) = -x 3 -cos(x), and p 0 = 1. Use Newton's method to find p 2 . Could p0=0 be used? Q2. Perform two iterations by Newton's method and the secant method to each of the following: a. e x + 2 - ...

Question a signal starts at point x as it travels to point

Question : A signal starts at point X. As it travels to point Y, it loses 8 dB. At point Y, the signal is boosted by 10 bB. As the signal travels to point Z, it loses 7 dB. The dB strength of the signal at point Z is -5 ...

1 this problem concerns of the proof of the np-completeness

(1) This problem concerns of the proof of the NP-completeness of 300L a) Convert the formula F into a 300L graph b) Find a solution for the 300L instance of F and verify that it is a solution for F F = (Z 1 V Z 2 ) ^ (z ...

Assignment - introduction to math programmingdirections

Assignment - Introduction to Math Programming Directions - Formulate a linear programming model for the following description. Include definitions of decision variables, Objective function, and constraints. Augment your ...

Assignment - lp problemsthe data for all the problems in

Assignment - LP problems The data for all the problems in this HW are included in the LP_problems_xlsx spreadsheet. Problem 1 - Cash Planning A startup investment project needs money to cover its cash flow needs. At the ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As