Q1: An inventor claims to have a heat engine producing mechanical power that extracts 25 kW of heat at 400 K and rejects 10 kW of heat at 200 K. Is this claim possible? (What is the Carnot efficiency of this? What is the claimed efficiency?)

Q2: For the following problem, use the TRNSYS model for flat plate solar collector. Weather data for Albuquerque, NM are in the TRNSYS database.

A flat plate solar collector supplies heat for an industrial process. The collector system is located in Albuquerque with total area of 60 square meters, incidence angle modifier constant bo of 0.1, and collector slope of 40 degrees. The collector is used 9 hours per day from 8AM to 5PM at the rate of 1500 kg/hr. A storage tank is used to store the hot water with tank volume of 10,000 lit. and tank height of 3m. The heat loss to the ambient air is at 4 kJ/(hr.m2.K), the initial water temperature is at 70 deg.C, and the storage tank is not equipped with heating installation. It can be assumed that the tank is fully-mixed with no stratification effects. Hot water is pumped at the rate of 250kg/hr, 9hr per day from 8AM to 5PM, from the tank to be connected to a heat extractor. The process requires heat at a rate of at least 12 kW at temperature of 80 deg.C for 9 hour per day from 8AM to 5PM. Heat that cannot be supplied by solar energy is supplied with an auxillary natural gas burning heater.

Hint: The heat extractor is modeled as an auxiliary cooling unit by setting the rate of energy removed as the heat extracted.

1. Plot the heat collected in solar collector, heat loss in the storage, additional heat needed using auxillary natural gas heat, and the heat extracted from heat extractor as a function of time for the month of March (TRNSYS has a plot function, plot heat values as a function of time in hours for the month of March).

2. Estimate the solar fraction for the month of March (Solar fraction = heat extracted/(heat collected + heat from auxillary natural gas heater)

3. Estimate the annual solar fraction

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91706399
  • Price:- $50

Guranteed 36 Hours Delivery, In Price:- $50

Have any Question?


Related Questions in Other Engineering

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

Question - show that the zero-point energy of a simple

Question - Show that the zero-point energy of a simple harmonic oscillator does not contribute to its entropy or heat capacity, but does contribute to its energy and Helmholtz function.

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Load fault level analysis amp protection design of a remote

LOAD, FAULT LEVEL ANALYSIS & PROTECTION DESIGN OF A REMOTE AREA MICROGRID Assignment Please undertake the following analyses: 1. Calculate the 3-phase fault levels on Bus 2, Bus 3 and Bus 4 with the main supply connected ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

1 online discussion forum - post your proposed topic and

1. Online Discussion forum - Post your proposed topic and chosen data set as well as a short plan for the project. This is required for approval of the topic. As discussed, students must select unique topics, therefore i ...

Assessment practical reportproduce a short technical report

Assessment: Practical Report Produce a short technical report in a form consistent with proteomic journals covering the techniques, results and interpretation of your proteomics experiment in the practical classes. The r ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

This is your second design assignment this assignment

This is your second design assignment. This assignment requires you to design a complex state machine. You are designing a digital alarm clock. There are various designs you can attempt. More complex designs are worth mo ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As