Q: Purpose of your homework

• Start reading about your Sun Shot homework on the Sun Shot website
• Provide a complete as possible analysis of your assigned Sun Shot initiative homework.
• Analyze the risks involved. Two types of risk:
- Business risk (Technology works, but will not have a market)
- Technical risk (The technology cannot overcome technical barriers)
• You will make calculations (using software called SAM) that demonstrates improved performance of Sun Shot technology over existing CSP technology
• Provide your own assessment of the future of the Sun Shot technology

Sun Shot Homework - Receivers and Heat Transfer Fluids

• My TOPIC;

• HALIDE AND OXY-HALIDE EUTECTIC SYSTEMS FOR HIGH PERFORMANCE HIGH TEMPERATURE HEAT TRANSFER FLUIDS -

Sun Shot Homework - Power Conversion and Systems
• Sun Shot technical targets for power block subsystems:
- High temperature power cycles
- Net cycle efficiency > 50%
- Dry cooled
- Cost < $1,200/kWe

Result of Your Homework - A Homework Report
• The report provides an analysis of your assigned Sun Shot homework and gives
- A Homework overview
- A discussion of the homework milestones (technical goals that have to be achieved for the technology to work)
- Supporting calculations (your own calculations that show the advantage of the new technology in application)
- Your own homework discussion about the feasibility and the risks involved, and the likelihood of homework success in a commercial setting
• Your work can benefit others!

Your homework
• The final report is 25 pages or less + 5 pages appendix including references
• Most of the information you need to do your homework is on the Internet
• Better to prepare your own graphs and diagrams using graphic software
• Summary of what you will calculate
• 5 page summary of your progress
• Critical assessment of the homework (10 pages max.)
• Power point presentation
• Homework submittal report (25 pages max. or less)

Simulation software to be used in this Homework for concentrated solar power

SAM from NREL

• SAM is renewable energy simulation software designed by NREL to analyze its energy and economic performance.
• Has capabilities to calculate both the energy produced and economic performance of a renewable energy plan
• Applicable to solar PV, concentrating solar collector, solar water heating, wind power, geothermal, biomass.
• Applicable to large scale renewable energy power plant
• You will use SAM for your course Homework in CSP

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91706396
  • Price:- $170

Guranteed 48 Hours Delivery, In Price:- $170

Have any Question?


Related Questions in Other Engineering

Load fault level analysis amp protection design of a remote

LOAD, FAULT LEVEL ANALYSIS & PROTECTION DESIGN OF A REMOTE AREA MICROGRID Assignment Please undertake the following analyses: 1. Calculate the 3-phase fault levels on Bus 2, Bus 3 and Bus 4 with the main supply connected ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Projection of planes1 a regular pentagon of 25 mm side has

Projection of Planes 1. A regular pentagon of 25 mm side has one side on the ground. Its plane is inclined at 45° to H.P. and perpendicular to the V.P. Draw its projections. 2. Draw the projection of a circle of 50 mm di ...

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

Part 1configure verify and troubleshoot wan links and ip

Part 1 Configure, verify and troubleshoot WAN links and IP services Answer to all questions below: 1. What is the name of the Safe Work Australia code of practise that provides guidance on how to manage the risks of elec ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As