Ask Other Engineering Expert

Project Objective

This project is concerned with the modeling, design and implementation of control strategies for the water twin tank process. The controlled variable is the water level in tank 2. The manipulated variable is the pump power, on the water inlet flow line to tank 1. Water flows from tank 1 to tank 2 and from tank 2 to the reservoir because of hydraulic pressure difference. Detailed, first principles-based, dynamic models as well as empirical models for the two water levels as a function of the manipulated variable must be developed and used for controller design. The PAS TuneWizard must be used to develop empirical models and tune the tank 2 water level controller.

Project Deliverables

You are being asked to prepare a written report on the design and performance of your control strategies. Your report must follow the rubric for technical reports discussed at the beginning of the course. Among others, it must contain the following key pieces of information:

Analytical Modeling (open loop)
1. First principles based dynamic models for the water levels (tank 1 and tank 2) with pump voltage as the input variable
2. Linearization of any non-linear models and development of transfer functions between:
a. tank 1 level and pump voltage.
b. tank 2 level and tank 1 level.
c. tank 2 level and pump voltage.

Empirical Modeling (open loop)
Development of transfer function model between:
a) tank 1 level and pump voltage.
b) tank 2 level and tank 1 level.
c) tank 2 level and pump voltage.
Comparison of transfer functions obtained using analytical and empirical methods

Single Feedback Control Structure
- Design of a PID controller when the controlled variable is the tank 2 level and manipulated variable is the pump voltage.
o Tune the level controller using your preferred tuning method and/or anyone of the methods in the PAS software. Two sets of tuning parameters for the tank 2 water level control loop will be developed: one using the analytical model and another using the empirical model.
- Evaluation of the closed loop performance on the experimental process for setpoint changes of
+1.5 inches in tank 2 level.
o Two sets of closed loop performance will be generated using each of the tuning parameters obtained in the previous step.
o Manual tuning adjustments may be required for improved setpoint control
Cascade Control Structure
- Design of a cascade control structure involving two controllers of PID form to control tank 2 level. In this cascade structure, the secondary controller will control tank 1 level by adjusting the pump voltage while the master controller will control tank 2 level by adjusting the setpoint of tank 1 level controller.
- Tune the level controllers using your preferred tuning method and/or anyone of the methods in the PAS software.
- Evaluate the closed loop performance on the experimental process for setpoint changes of +1.5 inches in tank 2 level.
o Two sets of closed loop performance will be generated using each of the tuning parameters obtained in the previous step.
o Manual tuning adjustments may be required for improved setpoint control

Hints:
- A similar problem (for one tank only) was discussed in class and is described in the class textbook.
- Think how the hydraulic pressure difference will affect the flow from tank 1 to tank 2. Does it depend on tank 1 level, tank 2 level or both?
- You may need to develop a relationship between the pump voltage and the resulting flow rate into tank 1. Think creatively on how to develop this relationship. A similar problem was solved in ENGR 3410!
- To develop the analytical models, an initial steady state must be established. Try a pump voltage value in the range of 3 to 3.25 VDC.

Notes:
- You will work in teams to complete this project. However, each team member will prepare his/her own report.
- The rubric for Technical reports must be followed
- If closed loop performance evaluation is not experimentally done, then your FINAL PROJECT grade is automatically zero.OPERATING

INSTRUCTIONS FOR TWIN WATER TANK EXPERIMENT

I. Project Description
- For easy understanding and use, the experimental process is being divided in three sections/components:
1. Process: twin-tank setup, a reservoir, 2 ultrasonic level transducers, ball valves, and a DC pump.
2. Data Acquisition Station: hardware that carries out the input-output (I/O) operations and allows communication between the Process and the Operator Station.
3. Operator Station: a PC based system with an appropriate Human-Interface-Machine (HMI) to operate and control the Process.

A. Process
- The physical layout of the process is designed as an interacting system of two tanks in series. The two identical tanks are made out of acrylic containers They are coupled by an ordinary poly vinyl chloride (PVC) ball valve type and PVC conjunction pipe, of which the diameter (d) is 0.5 inches. A simple process schematic is shown in Figure 1.

1072_Figure.jpg

Fig 1 Interacting Series Tanks

Physical dimensions of the twin-tank process:

Dimensions of Tank 1 and Tank2
Approximately similar dimensions
5½ in x 5 in x 14½ in (L x W x H)
13.97 cm x 12.7 cm x 36.83 cm (L x W x H)

Dimensions of Reservoir
14 in x 23½ in x 13½ in (L x W x H)
35.56 m x 59.69 cm x 34.29 cm (L x W x H)

- The liquid levels in both tanks are regulated by the volumetric flow rate into the tank 1, which is affected by the voltage to the water pump (13.5 V - 1.8 A). Both tank level controllers (depends on single loop or cascade control), programed in the LabVIEW platform, manipulate a pulse width modulation (PWM) signal through the NI USB6009, a National Instrument data acquisition device (DAQ), to control the water pump voltage.

- Liquid levels are measured and calibrated by two ultrasonic level measurement transducers or sensors in inches. Signals, sending from the level sensors, typically 4
- 20 mA, are transmitted to the input signal channels, AI1 and AI2, of the DAQ NI USB 6009.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92275818
  • Price:- $75

Priced at Now at $75, Verified Solution

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As