Activity Description Resource Duration (days) Preceding Activity
1 Architectural decisions Design 25 --
2 Hardware specifications Development, design 50 1
3 Kernel specifications Design 20 1
4 Utilities specifications Development, design 15 1
5 Hardware design Design, development 70 2
6 Disk drivers Assembly, development 100 3
7 Memory management Development 90 3
8 Operating system documentation Design, documentation 25 3
9 Routine utilities Development 60 4
10 Complex utilities Development 80 4
11 Utilities documentation Documentation, design 20 4
12 Hardware documentation Documentation, design 30 5
13 Integration first phase Assembly, development 50 6,7,8,9,10,11,12
14 Prototypes Assembly, development 80 13
15 Serial I/O drivers Development 130 13
16 System hard/software test Assembly 25 14, 15
17 Order circuit boards Purchasing 5 16
18 Network interface Development 90 16
19 Shell Development 60 16
20 Project documentation Documentation, development 50 16
21 Assemble preproduction models Assembly, development 30 17F-S, lag 50 days
22 Integrated acceptance testing Assembly, development 60 18,19,20,21

Prompt: Create a Microsoft Project file for the above. Note the following:

1. Each work package will represent an acitivity.

2. The project beings January 4, 2010.

3. The following holidays are observed: January 1, Memorial Day (last Monday in May), July 4th, Labor Day (first Monday in September), Thanksgiving Day (4th Thursday in November), December 25 and 26.

4. If a holiday falls on a Saturday then Friday will be a day off; if it falls on a Sudany, then Moday will be a day off.

The project teams work eight-hour days, Monday through Friday.

Prompt B: Create a Word document addressing the following questions:

1. When is the project estimated to be completed?

2. How long will the project take?

3. What is the critical path(s) for the project?

4. Which activity has the greates amount of slack?

5. Identify two sensible milestones and explain your choices.

6. Compare and escribe the advantages/disadvantages of displaying the schedule as a network versus a Gantt chart.

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M93097629

Have any Question?


Related Questions in Computer Engineering

Does bmw have a guided missile corporate culture and

Does BMW have a guided missile corporate culture, and incubator corporate culture, a family corporate culture, or an Eiffel tower corporate culture?

Rebecca borrows 10000 at 18 compounded annually she pays

Rebecca borrows $10,000 at 18% compounded annually. She pays off the loan over a 5-year period with annual payments, starting at year 1. Each successive payment is $700 greater than the previous payment. (a) How much was ...

Jeff decides to start saving some money from this upcoming

Jeff decides to start saving some money from this upcoming month onwards. He decides to save only $500 at first, but each month he will increase the amount invested by $100. He will do it for 60 months (including the fir ...

Suppose you make 30 annual investments in a fund that pays

Suppose you make 30 annual investments in a fund that pays 6% compounded annually. If your first deposit is $7,500 and each successive deposit is 6% greater than the preceding deposit, how much will be in the fund immedi ...

Question -under what circumstances is it ethical if ever to

Question :- Under what circumstances is it ethical, if ever, to use consumer information in marketing research? Explain why you consider it ethical or unethical.

What are the differences between four types of economics

What are the differences between four types of economics evaluations and their differences with other two (budget impact analysis (BIA) and cost of illness (COI) studies)?

What type of economic system does norway have explain some

What type of economic system does Norway have? Explain some of the benefits of this system to the country and some of the drawbacks,

Among the who imf and wto which of these governmental

Among the WHO, IMF, and WTO, which of these governmental institutions do you feel has most profoundly shaped healthcare outcomes in low-income countries and why? Please support your reasons with examples and research/doc ...

A real estate developer will build two different types of

A real estate developer will build two different types of apartments in a residential area: one- bedroom apartments and two-bedroom apartments. In addition, the developer will build either a swimming pool or a tennis cou ...

Question what some of the reasons that evolutionary models

Question : What some of the reasons that evolutionary models are considered by many to be the best approach to software development. The response must be typed, single spaced, must be in times new roman font (size 12) an ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As