Ask Computer Engineering Expert

Project Assignment

This programming project involves writing a program to calculate the terms of the following sequence of numbers: 0 1 2 5 12 29 ... where each term of the sequence is twice the previous term plus the second previous term. The 0th term of the sequence is 0 and the 1st term of the sequence is 1.

For example:

0 1 2 -> (0 + 1 + 2) + 2 = 5
0 1 2 5 -> (0 + 1 + 2 + 5) + 5 = 12
0 1 2 5 12 -> (0 + 1 + 2 + 5 + 12) + 12 = 29

...

The interface to the program should be a GUI that looks similar to the following:

1258_GUI.jpg

The pair of radio buttons allows the user to choose whether an iterative or recursive method is used to compute the term of the sequence. When the user enters a value for n and then clicks the Compute button, the nth term of the sequence should be displayed in the Result field. The Efficiency field should contain the number of calls to the recursive method when the recursive option is chosen and the number of iterations of the loop when the iterative option is selected.

The Iterative radio button should be initially set to selected.

When the window is closed, the efficiency values should be computed with values of n from 0 to 10 and written to a file. Each line of the file should contain the value of n, the efficiency of the iterative method for that value of n and the efficiency of the recursive method. The values should be separated by commas so the file can be opened with Excel and used to graph the value of the efficiencies for both the iterative and recursive options along the y axis with the value of n along the x-axis. The graph should be included in the Word document that accompanies this project and should also contain a brief explanation of the observed results.

The program should consist of two classes.

1. The first class should define the GUI. In addition to the main method and a constructor to build the GUI, an event handler will be needed to handle the Compute button click and another handler will be needed to produce the file described above when the window is closed. The latter handler should be an object of an inner class that extends the WindowAdapter class.

2. The other class should be named Sequence. It should be a utility class meaning that all its methods must be class (static) methods and no objects should be able to be generated for that class. It should contain three public methods:

a. The first method computeIterative should accept a value of n and return the corresponding element in the sequence using iteration.

b. The second method computeRecursive should accept a value of n and return the corresponding element in the sequence using recursion. This method will be a helper method because it will need to initialize the efficiency counter before calling the private recursive method that will actually perform the recursive computation.

c. The third method getEfficiency will return the efficiency counter left behind by the previous call to either of the above two methods.

The google recommended Java style guide, provided as link in the week 2 content, should be used to format and document your code. Specifically, the following style guide attributes should be addressed:

• Header comments include filename, author, date and brief purpose of the program.

• In-line comments used to describe major functionality of the code.

• Meaningful variable names and prompts applied.

• Class names are written in UpperCamelCase.

• Variable names are written in lowerCamelCase.

• Constant names are in written in All Capitals.

• Braces use K&R style.

In addition the following design constraints should be followed:

• Declare all instance variables private
• Avoid the duplication of code

Test cases should be supplied in the form of table with columns indicating the input values, expected output, actual output and if the test case passed or failed. This table should contain 4 columns with appropriate labels and a row for each test case. Note that the actual output should be the actual results you receive when running your program and applying the input for the test record. Be sure to select enough different scenarios to completely test the program.

Note: All code should compile and run without issue.

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M92543416

Have any Question?


Related Questions in Computer Engineering

Does bmw have a guided missile corporate culture and

Does BMW have a guided missile corporate culture, and incubator corporate culture, a family corporate culture, or an Eiffel tower corporate culture?

Rebecca borrows 10000 at 18 compounded annually she pays

Rebecca borrows $10,000 at 18% compounded annually. She pays off the loan over a 5-year period with annual payments, starting at year 1. Each successive payment is $700 greater than the previous payment. (a) How much was ...

Jeff decides to start saving some money from this upcoming

Jeff decides to start saving some money from this upcoming month onwards. He decides to save only $500 at first, but each month he will increase the amount invested by $100. He will do it for 60 months (including the fir ...

Suppose you make 30 annual investments in a fund that pays

Suppose you make 30 annual investments in a fund that pays 6% compounded annually. If your first deposit is $7,500 and each successive deposit is 6% greater than the preceding deposit, how much will be in the fund immedi ...

Question -under what circumstances is it ethical if ever to

Question :- Under what circumstances is it ethical, if ever, to use consumer information in marketing research? Explain why you consider it ethical or unethical.

What are the differences between four types of economics

What are the differences between four types of economics evaluations and their differences with other two (budget impact analysis (BIA) and cost of illness (COI) studies)?

What type of economic system does norway have explain some

What type of economic system does Norway have? Explain some of the benefits of this system to the country and some of the drawbacks,

Among the who imf and wto which of these governmental

Among the WHO, IMF, and WTO, which of these governmental institutions do you feel has most profoundly shaped healthcare outcomes in low-income countries and why? Please support your reasons with examples and research/doc ...

A real estate developer will build two different types of

A real estate developer will build two different types of apartments in a residential area: one- bedroom apartments and two-bedroom apartments. In addition, the developer will build either a swimming pool or a tennis cou ...

Question what some of the reasons that evolutionary models

Question : What some of the reasons that evolutionary models are considered by many to be the best approach to software development. The response must be typed, single spaced, must be in times new roman font (size 12) an ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As