Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

Project -

Power System Protection - Differential Protection

Use the CTs provided to design a bus differential scheme for the substation below. Show each 87 relay as a circle and connect the appropriate CTs to the relay. Do not worry about the "unused" relays - they will be used for the line distance relays (designed by another engineer - not by you). Draw dashed arrows from each 87 relay to the breaker or breakers it trips.

1804_figure.png

Then wire the transformer differential relays in the diagram on the next page. Show the CT connections and label the currents in each power circuit and in each part of the CT secondary circuits. Be sure to "treat" any unused CTs appropriately.

677_figure1.png

Component Non-Radial System Protection

Start with the transmission line shown below.

903_figure2.png

First, connect one of the CTs (the correct one) to each of the distance relays. Then treat the unused CT the way unused CTs need to be handled. Then draw a dashed line with an arrow pointing from each of the distance relays to the breaker it trips.

Now, implement a permissive underreaching transfer trip (PUTT) protection scheme for the transmission line. Assume the line is 100 miles long. Specify zone settings in miles (instead of mhos), with positive numbers indicating a distance in front of the relay and negative numbers indicating a distance behind the relay.  Complete the following table:

Relay

Settings

Zone 1

Zone 2

Zone 3

21-1




21-2




Finally, explain exactly what should happen when faults occur at locations A, B, and C by completing the table below. The "Which zone sees the fault" column should contain a number 1, 2, or 3, and the "Pilot Signal" and "Send breaker trip signal?" columns should contain a "yes" or "no".

 

Fault Location

21-1

21-2

Which zone sees the fault?

Pilot Signal

Send breaker trip signal?

Which zone sees the fault?

Pilot Signal

Send breaker trip signal?

 

Sent

 

Received

 

Sent

 

Received

A









B









C









Textbook - INDUSTRIAL POWER DISTRIBUTION, SECOND EDITION by RALPH E. FEHR, III.

Attachment:- Project.rar

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92562543

Have any Question?


Related Questions in Other Engineering

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Load fault level analysis amp protection design of a remote

LOAD, FAULT LEVEL ANALYSIS & PROTECTION DESIGN OF A REMOTE AREA MICROGRID Assignment Please undertake the following analyses: 1. Calculate the 3-phase fault levels on Bus 2, Bus 3 and Bus 4 with the main supply connected ...

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As