Ask Other Engineering Expert

Problems - Complete the following problems located in the text: Howe, K. J., Hand, D. W., Crittenden, J. C., Trussell, R. R., & Tchobanoglous, G. (2011). Principles of Water Treatment (1st ed.). Hoboken, New Jersey, USA: John Wiley & Sons.

1. RSSCT columns were used to determine the bed life of a fixed-bed adsorption system for the removal of methyl-tert-butyl ether (MTBE) from a raw water source. The RSSCT column had a media particle diameter of 0.19 mm, superficial velocity of 45.0 m/h, and EBCT of 27 s. Under those conditions, breakthrough of MBTE occurred in 12.28 d. If the full-scale adsorber is designed with a media particle diameter of 1.10 mm, calculate the appropriate EBCT and superficial velocity of the full scale column, and the predicted operating time before breakthrough of MBTE occurs.

2. Calculate the minimum air-to-water ratio for a countercurrent packed tower for 95 percent removal of chloroform and benzene at 10oC.

3. A treatment plant has been designed to achieve 99 percent inactivation of C. parvum using ozonation. The engineer used data on ozonation of C. parvum at 20oC for the design, but the plant operates in a northern climate and the water temperature will be 0.5?C in winter. Estimate how much inactivation the plant will actually achieve when the water is at that temperature, assuming the plant will achieve the same Ct value, inactivation of C. parvum follows the Chick-Watson model (Eq. 13-31), and that disinfection kinetics follow the Arrhenius' equation (Eq. 4-33). Use an Ea value of 76 kJ/mol.

4. Determine the mass and volume of sludge produced and the volume of sludge as a percentage of the total flow from the use of alum [Al2(SO4)3•6 or 14 or 18H2O] for the removal of turbidity. Assume the following conditions apply: (1) flow rate is 0.05 m3/s, (2) average raw-water turbidity is 45 NTU, and (3) average alum dose is 40 mg/L, sludge solids concentration is 5 percent with a corresponding specific gravity of 1.05, and temperature is 10?C. Assume the ratio between total suspended solids and turbidity expressed as NTU is 1.33 and 0.3kg of alum sludge is produced per kilogram of alum added. Assume 1 mg/L of a coagulant aid will also be used. Value of bound water to be selected by instructor.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92536547

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As