Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Computer Engineering Expert

Problem 1: Explain the difference between the short-run and the long-run with regard to firm behavior. What are fixed and variable factors of production, and how does this distinction relate to the short-run, long-run distinction? How does the concept of sunk costs relate to fixed and variable costs?

Problem 2: Carefully explain why the short-run supply curve for a competitive firm is the portion of its short-run margin cost curve above its average variable cost. Why would a firm be willing to operate at a loss in the short-run, but not in the long-run? Carefully explain the distinction between the short-run and the long-run in your answer.

Problem 3: Suppose a firm's short-run total cost function is described by the following quadratic cost function:

C(q) = 100 + 6q + q2.

Solve for the equations for the firm's MC, AVC, and ATC curves. Construct a graph showing the firm's MC, AVC, and ATC curves.

Problem 4: Consider the table below which gives two total cost schedules for two different scales of operation for a firm. TC1 is for a fixed cost of $25, while TC2 is for a fixed cost of $30. Assume the firm is a price taker.

Output per month

TC1

TC2

0

$25

$30

1

45

45

2

57

63

3

70

76

4

84

91

5

102

107

6

123

125

7

147

145

8

175

167

9

209

191

10

249

223

a. If the market price is $25, at what output, rate will the firm maximize profits in the long run? Does it matter whether the firm believes that a price of $25 will persists as the equilibrium price? Carefully explain.

b. Suppose the price falls to $19 from $25. How would the firm react in the short run if it expected the $19 price to be temporary, remaining to $25? What would the firm do if it expected the new $19 price to be permanent?

Problem 5: A firm produces units of output (q) by applying the production function q = L.5 .K.5, where L and K refer to labor and capital, respectively. The firm faces fixed per-unit prices for L and K (PL = 10 and PK = 40) and chooses a long-run output rate of q = 50. First, solve for the long-run optimal (cost-minimizing) input combination of L and K for q = 50. Second, given the firm has chosen the optimal K for q = 50, derive the firm's short-run total cost function. Third, derive the function for short-run ATC, AVC, and MC. Finally, if the firm is competitive and faces an output price P = 40, what is the firm's short-run profit-maximizing output and total profit?

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M91522756
  • Price:- $50

Priced at Now at $50, Verified Solution

Have any Question?


Related Questions in Computer Engineering

What is the supply curve how do you apply the law of supply

What is the supply curve, how do you apply the law of supply in economics?

Sql transactions exercisesfor the universal relation rwxyz

SQL Transactions Exercises For the universal relation R(w,x,y,z), consider the decomposition D consisting of R1(w,y,z) and R2(x,y), and the set F of functional dependencies { y->xz ; yz->w ; x->w }. Recall that the proje ...

Suppose you would like to sort n music files using a

Suppose you would like to sort n music files using a comparison-based sorting algorithm (i.e. no bucket sort), but you only have an old, unreliable computer, which you have nicknamed "Rustbucket". Every time Rustbucket c ...

Question reflect on a system that you have analyzed

Question : Reflect on a system that you have analyzed, designed and manufactured in the past. Address the following: Summarize your selected software system to provide context for your colleagues. Summarise the methodolo ...

Suppose alice shares a secret block cipher key kab with bob

Suppose Alice shares a secret block cipher key, K_AB with Bob, and a different secret block cipher key, K_AC with Charlie. Describe a method for Alice to encrypt an m-block message such that it can only be decrypted with ...

Task 1 use the sumofnnumbersjava file create a method that

Task 1: Use the sumOf_N_Numbers.java file. Create a method that takes in two parameters namely the starting and ending number of the range and returns the sum of all the numbers in that range to the calling method Task 2 ...

A sample of 36 us households is taken and the average

A sample of 36 U.S. households is taken and the average amount of newspaper garbage or recycling is found to be 27.8 pounds with a standard deviation of 2 pounds. Estimate, with 99% confidence, the mean amount of newspap ...

This is a simple exercise to introduce the use of arrays

This is a simple exercise to introduce the use of arrays and some of the common errors that occur when programming with them in c++. • Write a simple program that allows the user to enter 10 integers into an array, then ...

Question please submit your draft apa-formatted research

Question: Please submit your draft APA-formatted research papers through this assignment page. You will have until the end of Week #4 to submit a draft of your paper for consideration as extra credit. This is Part 1 of t ...

Assume you have been selected to build a system for

Assume you have been selected to build a system for Oil&Gas company. Do you prefer to build a win-based system or a web-based system? Why?

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As