PROBLEM : Machine Shop Grinders

Jake's Machine Shop contains a grinder for sharpening the machine cutting tools. A decision must now be made on buying 1 or 2 more additional grinders. The grinding time required by a machine operator to sharpen cutting tool has an exponential distribution with mean grinding time equal to 1 minute. The machine operators arrive randomly to sharpen their tools at a mean rate of one every two minutes and the inter-arrival time is exponentially distributed.

The maintenance cost for a single grinder is estimated to be $1 per minute. The estimated cost of an operator being away from his/her machine for grinding his tools is $0.80 per minute (once an operator leaves for grinding, he/she does not come back until he/she grinds the tools and the time to go to the grinder is negligible).

Suppose that you are in the control of making decisions for buying additional grinders. You want to decide to buy 1 or 2 more additional grinders, or not to buy any more grinders. If you have more than one grinders, the machine operators will form a single line and the one in the front of the line will go to the next available grinder.

You can use the excel templates for calculating the measures of performance.

a) Calculate different measures of performance (L, Lc, W, WQ), when you do not buy any additional grinders. That is, when you have a single grinder. Also, calculate the cost per minute of the system with a single grinder.

b) Calculate different measures of performance (L, Lo, W, WQ), when you buy one additional grinder. That is, when you have two grinders. Also, calculate the cost per minute of the system with two grinders.

c) Calculate different measures of performance (L, Lc, W, WQ), when you buy two additional grinders. That is, when you have three grinders. Also, calculate the cost per minute of the system with three grinders.

d) Comparing costs per minute in parts a, b, and c, what is the decision you should make to minimize the cost per minute?

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91075471

Have any Question?


Related Questions in Other Engineering

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Load fault level analysis amp protection design of a remote

LOAD, FAULT LEVEL ANALYSIS & PROTECTION DESIGN OF A REMOTE AREA MICROGRID Assignment Please undertake the following analyses: 1. Calculate the 3-phase fault levels on Bus 2, Bus 3 and Bus 4 with the main supply connected ...

Part 1configure verify and troubleshoot wan links and ip

Part 1 Configure, verify and troubleshoot WAN links and IP services Answer to all questions below: 1. What is the name of the Safe Work Australia code of practise that provides guidance on how to manage the risks of elec ...

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

Conceptual design of forced-free-mixed convection

Conceptual Design of Forced-Free-Mixed Convection Experiment This assessment is to be completed individually. 1. Learning Outcomes: - Develop a basic ability to conceptually design an experimental apparatus - Use theory ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

1 online discussion forum - post your proposed topic and

1. Online Discussion forum - Post your proposed topic and chosen data set as well as a short plan for the project. This is required for approval of the topic. As discussed, students must select unique topics, therefore i ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As