Answer both questions. Any graphs or charts should be produced using software packages, but the method of working for each question must be shown.

Question 1

The village of pongelton is in the valley of the River Pong. The mean flow of the river is 3.0 m3/s. The population of Pongelton is 6,000. The daily average water consumption is 250 litre/ head/day. Water utilisation (i.e. the water spent for watering gardens, watering animals, etc) is 20%.

Sewers are built in the village and the construction of a sewage treatment works is planned. The local government also wishes to construct a small recreational reservoir downstream & the site of the planned effluent discharge. The Environment Agency requires an assurance that the aquatic environment of the planned reservoir will not be impaired by the discharge of the final effluent from the sewage treatment works. Thus, the Environment Agency will require the sewage treatment works to be designed for phosphorus removal, in order to avoid eutrophication downstrearn of the discharge. To achieve this, the concentration of phosphorus in the inflow to the planned reservoir must be less than 40 mg/m3. The average phosphorus concentration of household sewage is 10 mg/l and the phosphorus concentration of the unpolluted river, upstream of Pongelton is 10 mg/m3.

You are the designer and must address the following issues:

1. If no treatment facility is provided, what will the phosphorus concentration of the river be downstream of the sewage discharge?

2. Does this value meet the EA's quality requirement?

3. If not, in percentage terms, what degree of treatment should be provided for phosphorus removal. Express your answer in percentage terms (i.e. percentage of phosphorus to be removed).

POLLUTION AND WATER QUALITY

Question 2

The town of Prettybrooks (population 65,000) is to build a new sewage treatment works. The Environment Agency requires an environmental impact assessment to be carried out for the project. The water quality targets to be met in the receiving watercourse, 12km downstream of the proposed the  sewage outfall are set as follows:

i) Dissolved oxygen (DO) not less than 6 mg/l, when the flow of the receiving water course, the river Little Lousy, upstream of the proposed Mantis 12 m3/s.

ii) BOD5 less than 6 mg/l within 0.5 days

Water consumption in Prettybrooks is 250 litre/ head / day on average and the estimated water losses of the system in the summer months (evaporation, gardening losses, leakage of the sewer system, etc) are 20%. Estimated raw sewage strength BOD5 is. 550 mg O2/l. Estimated raw sewage DO concentration is 1.5 mg/l. Assume a de-oxygenation rate constant, K1 of 0.37 day-1 at 20oC (to base e).

The Environment Agency has supplied the following background data for the river Little Lousy upstrearrm of the proposed discharge point:

  • BOD5 concentration: 6 mg/I
  • DO: 7 mg O2/1
  • River velocity= 0.4 m/s
  • Mean depth of stream: 1.3 m
  • The mean river temperature is 19 oC

Calculate:

(i) if raw sewage is discharged with no treatment, the critical time corresponding to the critical deficit, and the distance downstream of the discharge point at which it occurs.

(ii) The critical DO deficit

POLLUTION AND WATER QUALITY

(iii) The time and distance for which the BOD criteria are violated if raw sewage is discharged with no treatment.

(iv) The amount of ROD to be removed at the proposed STW in order that the EA requirements are met.

(v) The revised critical time and deficit associated with item (iv).

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92178884
  • Price:- $45

Priced at Now at $45, Verified Solution

Have any Question?


Related Questions in Other Engineering

Part 1configure verify and troubleshoot wan links and ip

Part 1 Configure, verify and troubleshoot WAN links and IP services Answer to all questions below: 1. What is the name of the Safe Work Australia code of practise that provides guidance on how to manage the risks of elec ...

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

Question - show that the zero-point energy of a simple

Question - Show that the zero-point energy of a simple harmonic oscillator does not contribute to its entropy or heat capacity, but does contribute to its energy and Helmholtz function.

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Assignment -problem 1 - given is the lcc difference

Assignment - Problem 1 - Given is the LCC difference equation that represents some LTI system: y(n) - ¾y(n-1) - ¼y(n-2) = x(n) + x(n-1)   a) Find the impulse response of the system (solve the LCCDE). b) Draw a block diag ...

Engineering analysis homework -for every problem provide

Engineering Analysis Homework - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Write a script that solves the problem. For (c), show results of the evaluation of every ind ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As