Ask Computer Engineering Expert

Please do not copy or paste from the web or book.

Summarize and discuss the reasons for conducting a design review and how you would select the attendees.

Also, who would you NOT select to attend and why?

Also include your expectations as the PjM of the outcome of the design review.

CONTRACT ANNOUNCEMENT

Inventory Specialists Inc. (ISI) has recently been awarded a $9M contract by OK.COM to design, produce, and demonstrate a prototype automated inventory picker and mailer for their company. OK.COM is attempting to rival Amazon in its ability to quickly get orders in the hands of their customers as quickly as possible.

The system architecture is based on inventory management hardware and software (IMS) developed by ISI and must take inputs from the Automated Order Taking (AOT) software developed for OK.COM by SAP Software and Solutions. AOT can take orders from both customers on-line as well as from company customer service personnel.

If the merchandise is in stock, AOT then generates an order output that the PickPOCIT system must be able to process. PickPOCIT will then automatically locate the product in the warehouse; select the product off the warehouse shelve; box it if necessary, and, depending on the customer selected shipping method (2-day or standard delivery), generate and paste a UPS or USPS mailing label on the box before delivering it to the shipping department.

If the shipment is less than 5 lbs, and it is being delivered to an address within 15 miles of the shipping facility, the package will be prepared for delivery to the customer using a drone that ISI will purchase from Drone Delivery Systems, Inc. If the package is to be delivered by the drone, it must be delivered within 30 minutes of the customer's order. OK.COM will provide the AOT software as "customer furnished equipment (CFE) at no cost to ISI.

ISI proposed the PickPOCIT System concept based on the adaptation of its well-proven and low cost IMS hardware and software, and a well-planned OK.COM system integration and performance demonstration program. Previous versions of IMS have been able to:

Take in and process 200 orders a minute

Utilizing "First-In/First-Out" logic, process, locate, package, and prepare for Shipping an order within three minutes

Mean Time Between Repairs - 2500 hours of continuous operation

Software will run on existing OK.COM computer hardware

These performance specifications are not to be compromised as a result of this application for the PickPOCIT Project.

In short, ISI proposed a Commercial Off-The-Shelf (COTS), Best Commercial Practices, Event Driven approach to the development, production, and demonstration of the prototype system. OK.COM stipulated in their Request for Proposal (RFP) that industry specifications and standards be used and that the prototype system must accept input form the AOT software provided as CFE from OK.COM. ISI is formally certified ISO9000 compliant.

ISI proposed a project of twelve (12) months duration and was the lowest price bid. The contract is fixed price ($9M) with a potential additional award fee of 3%, split 60/40 on schedule and performance.

STATEMENT OF OBJECTIVES

OK.COM seeks to acquire, install, and test an automated stock picker and mailer capability to get orders to their customers via a drone,  UPS, or USPS depending on the size of the package and/or the delivery time the customer selects. The system must be installed, tested, and operational by next spring in its Baltimore, Maryland warehouse in time for an operational test already coordinated and scheduled for month 11 providing validation two months in advance of "Black Friday" 2017. .

If this prototype capability works, OK.COM will purchase 50 PickPOCIT systems for each warehouse, of which there are 50 warehouses around the United States and Canada, in time for the "Black Friday" sales rush in 2018.

PROJECT PLAN SUMMARY

ISI will develop, install, train operators and administrators, and support the demonstration test of the PickPOCIT system.

The PickPOCIT project will consist of:

1. Software refinement in order to implement the SAP AOT software.

2. PickPOCIT installation and test at the OK.COM warehouse in Baltimore, Maryland.

3. System Administrator Training.

4. Providing technical and training support during of an operational test during month 11.

Major Milestone Events for the PickPOCIT project are:

Event Date

Contract Award August 31, 2016

Project Baseline 1 month after award

SEMP (System Engineering Master Plan) 2 months after award

TEMP (Test & Evaluation Master Plan) 3 months after award

PDR (Preliminary Design Review) 4 months after award

CDR (Critical Design Review) 6 months after award

System Integration Tests 7 months after award

Full System Demonstration Tests 8 months after award

System Installation 9 months after award

Operator and System Administrator Training 10 months after award

Support Operational Test 11 months after award

Contract Test Report and all Final Documentation 12 months after award (31 Jul 2017)

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M93082649

Have any Question?


Related Questions in Computer Engineering

Does bmw have a guided missile corporate culture and

Does BMW have a guided missile corporate culture, and incubator corporate culture, a family corporate culture, or an Eiffel tower corporate culture?

Rebecca borrows 10000 at 18 compounded annually she pays

Rebecca borrows $10,000 at 18% compounded annually. She pays off the loan over a 5-year period with annual payments, starting at year 1. Each successive payment is $700 greater than the previous payment. (a) How much was ...

Jeff decides to start saving some money from this upcoming

Jeff decides to start saving some money from this upcoming month onwards. He decides to save only $500 at first, but each month he will increase the amount invested by $100. He will do it for 60 months (including the fir ...

Suppose you make 30 annual investments in a fund that pays

Suppose you make 30 annual investments in a fund that pays 6% compounded annually. If your first deposit is $7,500 and each successive deposit is 6% greater than the preceding deposit, how much will be in the fund immedi ...

Question -under what circumstances is it ethical if ever to

Question :- Under what circumstances is it ethical, if ever, to use consumer information in marketing research? Explain why you consider it ethical or unethical.

What are the differences between four types of economics

What are the differences between four types of economics evaluations and their differences with other two (budget impact analysis (BIA) and cost of illness (COI) studies)?

What type of economic system does norway have explain some

What type of economic system does Norway have? Explain some of the benefits of this system to the country and some of the drawbacks,

Among the who imf and wto which of these governmental

Among the WHO, IMF, and WTO, which of these governmental institutions do you feel has most profoundly shaped healthcare outcomes in low-income countries and why? Please support your reasons with examples and research/doc ...

A real estate developer will build two different types of

A real estate developer will build two different types of apartments in a residential area: one- bedroom apartments and two-bedroom apartments. In addition, the developer will build either a swimming pool or a tennis cou ...

Question what some of the reasons that evolutionary models

Question : What some of the reasons that evolutionary models are considered by many to be the best approach to software development. The response must be typed, single spaced, must be in times new roman font (size 12) an ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As