Ask Other Engineering Expert

Mechanical Design (48650) – Spring Semester 2012
Optimisation Assignment – BUILDING A ROAD
Teams of THREE to FIVE [3 to 5] – Worth 20% of the Semester Grade
Due: Thursday 23rd March 2012 by 23:59 pm
Where? My Assignment Box [No 15] situated in Building 2 between Floors 5 & 6 below the big computer lab on level 6. This is the only way to submit – it eliminates confusion.
Late submissions (without prior permission) will be penalised at -10% per day late. Submissions more than one week late will not be accepted.
Students organise themselves into teams; share out the work; plan a timetable with delivery dates; hold regular face to face meetings and issue minutes, and; show fellow team members how to do things. Acknowledge outside assistance from other students in the report.
1. Background
The cost of building a road depends upon many things. For the purposes of this assignment it will depend on total distance covered and quantity of material cut from a hill, the quantity of material to fill hollows and the net amount of excess earth trucked to/from the area to make up for that used internally. The area being considered covers the coordinates from x = -5 to x = +5 kilometres and from y = +5 to y = -5 kilometres. The height of a point (z in metres) within the area is found from the equation:
z = sin [(x-y2)?/14] + sin [(2x+y)?/9)] - 0.37 {illustrated in the contour map below}
Five pairs of roads can start from the West at x=-5 and y =+4, +2, 0, -2 and -4 always travelling eastward. The pair starting at y = +4 finish at y = 1 and y = -1: the pair starting at y = +2 finish at y = +5 and y = -2: the pair starting at y = 0 finish at y = -3 and y = +3: the pair starting at y = -2 finish at y = -5 and y = +1, and: the pair starting at y = -4 finish at y = +1 and -1. The roads run horizontally at z = zero metres.
The costs (in units of $100,000) are:
Road construction cost is 7/km Cost to fill a hollow is 3/km.metre
Cost to cut into a hill is 2/km.metre. Cost to truck net excess earth to/from the area is 3.5/km.metre
The cut or fill for each step is zav . ?s, where zav = (zleft + 2zmid + zright)/4 and ?s is the step road length.
2. Teams
Teams of three start at x = -5 and y = +4, 0 and -4. Teams of 4 start at x = -5 and y = +4, +2, 0 and -2. Teams of five will start at x = -5 and y =+4, +2, 0, -2 and -4. Each team member will do 2 roads starting at one point and a team will cover all roads allocated to them.
3. The Task
3.1 Maps: Produce a contour map better than that shown below and also a three-dimensional surface graph of the ground. Divide the x and y ranges into steps of 0.25 km.
[Hint; Look up the “range” naming function in “Help” – it allows you to easily write a general formula that can be written to any cell to calculate z and it will automatically step through the x- and y-ranges.]
3.2 Optimisation: Using an optimisation package such as “Solver” in Excel, determine the road path which gives the minimum cost for each starting and finishing point examined by the team. Plot the road route and z-elevation profile for each road. A small bonus will be awarded for the team with the lowest cost, viable solution.
[Hints: Move from x = -5 to x = +5 in steps of 0.5 km [or 0.25 km, preferably]. Determine the (i) the road distance for the step and it’s cost; (ii) the z at the half x-step co-ordinates; (iii) the “fill” or “cut” for that step; (iv) the cost of the fill or cut for that step; (v) the net fill or cut for the road and it’s cost; (vi) the total road cost, and; (vii) optimise the y-path to minimise total cost. Check for correct operation by putting all costs except road construction to zero – you should get a straight line road path. Warning! Try several initial path guesses to get the “best” path. “Play’ with the option settings in Solver.]

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M9501847

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As