Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

Maintenance of Aircraft under “B” conditions: 

The maintenance of aircraft flying under "B" conditions must be adequate in relation to the number and duration of the flights. If a prolonged sequence of flights is expected, a programme of maintenance must be prepared. Procedures shall be in place to ensure that provision is made for any additional maintenance which may arise from development or modification of the aircraft whilst under "B" conditions.

The aircraft shall be certified as 'fit for flight' after maintenance in accordance with the preceding paragraph.

On completion of all flights under "B" conditions, a Flight Test Certificate must be completed by the pilot/captain and all annotated defects rectified or re-tested.

Once the first flight has been satisfactory completed, a series of subsequent flights establish the airworthiness of the aircraft with regards to speed and height envelopes, noise, specific fuel consumption, handling qualities and many other characteristics needing to be quantified.

Each flight must be in accordance with a flight test schedule which has been drawn up by the manufacturer and approved by the C.A.A. (See extract from BCAR A2-3 below)

The applicant shall submit for approval a flight test schedule, containing details of the proposed flight tests to be included in the Airworthiness Acceptance Trials. This schedule shall include the flight tests necessary: 

(a) To establish compliance with the appropriate airworthiness requirements.

(b) To provide information for inclusion in the documents associated with the Certificate of Airworthiness (Or Permit to Fly - see later).

NOTE:    The C.A.A. may require alterations to the flight test schedule, and may also require additional tests not included in the schedule if it appears that such test are necessary to establish the airworthiness of the aircraft type.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M9507557

Have any Question?


Related Questions in Other Engineering

Part 1configure verify and troubleshoot wan links and ip

Part 1 Configure, verify and troubleshoot WAN links and IP services Answer to all questions below: 1. What is the name of the Safe Work Australia code of practise that provides guidance on how to manage the risks of elec ...

Engineering analysis homework -for every problem provide

Engineering Analysis Homework - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Write a script that solves the problem. For (c), show results of the evaluation of every ind ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Assignment -problem 1 - given is the lcc difference

Assignment - Problem 1 - Given is the LCC difference equation that represents some LTI system: y(n) - ¾y(n-1) - ¼y(n-2) = x(n) + x(n-1)   a) Find the impulse response of the system (solve the LCCDE). b) Draw a block diag ...

Question - show that the zero-point energy of a simple

Question - Show that the zero-point energy of a simple harmonic oscillator does not contribute to its entropy or heat capacity, but does contribute to its energy and Helmholtz function.

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As