Introductions
On December 11, 1998, NASA launched the Mars Climate Orbiter (MCO). The mission of the MCO was to gather Martian climate data and serve as a relay station for the Mars Planet Lander (MPL), which would follow shortly thereafter. For nine months the MCO traveled through space. Some unplanned course corrections were executed during the trip, but no major issues were identified. On September 23, 1999, the MCO entered Martian atmosphere. It began an orbit that would take it temporarily out of radio contact behind the planet, as expected. The satellite was never heard from again.
Subsequent investigation revealed that a systemic failure caused the MCO to enter the atmosphere at an altitude approximately 100 miles lower than planned. The failure was traced to thrusters designed to use Metric units but supplied data programmed in English units. The satellite may have incinerated in the Martian atmosphere or continued traveling through space, unable to communicate with Earth.
The Mars Climate Orbiter Mishap Investigation Board was commissioned to investigate what happened. This investigation report identified 8 contributing causes that allowed the units problem to remain undetected .lists these contributing causes. A selected set of these items will be discussed in this paper and suggestions will be made to address them. This paper will also examine the concept of Intellectual Bias as it applies to the loss of the MCO. The investigation report also proposed 15 general recommendations for mitigating problems in the future. These recommendationsare, in the main, generalizations that require specific mappings into existing processes used by NASA.The general recommendations are enumerated .

An XML-formatted file could be contrived to specify English/Metric as well as specific units of measure for all the values in the file.illustrates how such an XML file might be structured.

Metric

Newtons

X

100

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91347195
  • Price:- $45

Guranteed 36 Hours Delivery, In Price:- $45

Have any Question?


Related Questions in Other Engineering

Part 1configure verify and troubleshoot wan links and ip

Part 1 Configure, verify and troubleshoot WAN links and IP services Answer to all questions below: 1. What is the name of the Safe Work Australia code of practise that provides guidance on how to manage the risks of elec ...

Assessment practical reportproduce a short technical report

Assessment: Practical Report Produce a short technical report in a form consistent with proteomic journals covering the techniques, results and interpretation of your proteomics experiment in the practical classes. The r ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering analysis assignment -for every problem provide

Engineering Analysis Assignment - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Plot the function f(t) = (x+5) 2 /(4+3x 2 ) for -3 ≤ x ≤ 5. using plot command. Use the ar ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

This is your second design assignment this assignment

This is your second design assignment. This assignment requires you to design a complex state machine. You are designing a digital alarm clock. There are various designs you can attempt. More complex designs are worth mo ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As