INSTALLATION OF PROPELLER

The method of installation will depend on the type of propeller, and all instructions detailed in the appropriate AMM should be carefully followed; these will include any special checks to be carried out, and details concerning lubrication, torque loading and locking or retaining parts. The following procedures are applicable to most propellers:

• Remove all protective covers and plugs, and clean parts which have been treated with a protective coating. Lubricate specified parts with the recommended grease or oil before installation.

• Fit the electrical brush gear housing to the engine reduction gear casing, and check that it is square with the engine shaft, using a dial test indicator clamped to the shaft.

• Fit the sling to the propeller, lightly smear the front and rear cone seatings with engineers' blue, and temporarily fit the propeller to check the contact area of the cones. Tighten the hub retaining nut by hand, rotate the propeller at least one revolution, then remove the propeller and check the extent of blueing of the cones. If the contact area is less than 80%, high stops may be removed by light stoning, or where permitted, by lapping on a suitable mandrel. Clean the cones and cone settings.

• With hydraulically-operated propellers, fit and lock the oil tubes in the engine shaft.

• Refit the propeller, lightly lubricate the splines, cone bore and threads with specified lubricants. Cone faces should not normally be lubricated, as this may result in looseness of the propeller when the oil film is lost. Lubricating the propeller bore, rather than the shaft will prevent any lubricant from being displaced on to the cone face when the propeller is installed.

• Turn the blades to the feathered angle, and fit the pitch-change mechanism.

• Install the brush gear, and check for correct contact between the brushes and the slip rings.

• Fit the spinner, and turn the blades through their full pitch range, to check for fouling.

 

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M9507635

Have any Question?


Related Questions in Other Engineering

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

Projection of planes1 a regular pentagon of 25 mm side has

Projection of Planes 1. A regular pentagon of 25 mm side has one side on the ground. Its plane is inclined at 45° to H.P. and perpendicular to the V.P. Draw its projections. 2. Draw the projection of a circle of 50 mm di ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Assignment -problem 1 - given is the lcc difference

Assignment - Problem 1 - Given is the LCC difference equation that represents some LTI system: y(n) - ¾y(n-1) - ¼y(n-2) = x(n) + x(n-1)   a) Find the impulse response of the system (solve the LCCDE). b) Draw a block diag ...

Introduction to engineering design assignment -

Introduction to Engineering Design Assignment - Drafting Question 1 - Field notes and traverse drawing may be an outdated form of keeping and presenting information on the position of features on a site. Modern electroni ...

Engineering analysis homework -for every problem provide

Engineering Analysis Homework - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Write a script that solves the problem. For (c), show results of the evaluation of every ind ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As